A Systematic Study of the Prediction Model for Operator-Induced Assembly Defects Based on Assembly Complexity Factors

It is a common view that the assembly process heavily affects a product's final quality and cost. The continuously shortening product life cycle requires a faster response speed as well as a lower defect rate in assembly production. In this situation, assembly quality control is becoming one of the most demanding problems in the modern manufacturing environment. The main causes of assembly defects can be classified into four categories, i.e., improper design, defective part, variance in assembly system, and operator error. The first three categories have been studied for many decades. However, elements of the operator error have not been fully explored. In this paper, using a copier assembly as an example, the problem of assembly defects caused by mistakes of operators is investigated systematically. A novel defect-rate prediction model is derived from the study of two complexity factors, namely, the design-based assembly complexity factor and the process-based assembly complexity factor, which are defined according to the structure and production characteristics of the copier. Several case studies consistently demonstrate that the new prediction model is accurate and stable for evaluating the copier assembly quality. Moreover, another case study offered in this paper demonstrates that the prediction model can provide effective assistance in the improvement of assembly quality.

[1]  Ann-Christine Falck,et al.  The effect of assembly tolerance on performance of a tape application task: A pilot study , 2004 .

[2]  Colin G. Drury,et al.  Ergonomics and quality in paced assembly lines , 2001 .

[3]  Tatsuya Suzuki,et al.  Assembly reliability evaluation method (AREM) , 2001, Proceedings of the 2001 IEEE International Symposium on Assembly and Task Planning (ISATP2001). Assembly and Disassembly in the Twenty-first Century. (Cat. No.01TH8560).

[4]  Qiang Huang,et al.  Variation transmission analysis and diagnosis of multi-operational machining processes , 2004 .

[5]  Shaohui Zheng Dynamic quality control in assembly systems , 2000 .

[6]  Arthur C. Sanderson,et al.  Two criteria for the selection of assembly plans: maximizing the flexibility of sequencing the assembly tasks and minimizing the assembly time through parallel execution of assembly tasks , 1991, IEEE Trans. Robotics Autom..

[7]  Qiang Su Applying case-based reasoning in assembly sequence planning , 2007 .

[8]  Jin Huang,et al.  Design for Assembly Versus Design for Disassembly: A Comparison of Guidelines , 2003 .

[9]  W. Mendenhall,et al.  Statistics for engineering and the sciences , 1984 .

[10]  Shenhou Liu Variation simulation for deformable sheet metal assembly. , 1995 .

[11]  J A Eklund,et al.  Relationships between ergonomics and quality in assembly work. , 1995, Applied ergonomics.

[12]  Julian D Booker,et al.  Designing for assembly quality: strategies, guidelines and techniques , 2005 .

[13]  Chen-Fu Chien,et al.  An AHP-based approach to ERP system selection , 2005 .

[14]  Ricardo Mateo,et al.  The impact of absenteeism on the quality of assembly line production: The importance of a specialization requirement , 2008 .

[15]  Qiang Su,et al.  A hierarchical approach on assembly sequence planning and optimal sequences analyzing , 2009 .

[16]  MengChu Zhou,et al.  Resource-Oriented Petri Net for Deadlock Avoidance in Flexible Assembly Systems , 2008, IEEE Transactions on Systems, Man, and Cybernetics - Part A: Systems and Humans.

[17]  Daniel E. Whitney,et al.  Modeling and controlling variation propagation in mechanical assemblies using state transition models , 1999, IEEE Trans. Robotics Autom..

[18]  Yong-Jin Liu,et al.  An adaptive genetic assembly-sequence planner , 2001, Int. J. Comput. Integr. Manuf..

[19]  Kwasi Amoako-Gyampah,et al.  Failure rate distributions for flexible manufacturing systems: An empirical study , 1999, Eur. J. Oper. Res..

[20]  Feng Zhang,et al.  A Data Mining Algorithm for Monitoring PCB Assembly Quality , 2007, IEEE Transactions on Electronics Packaging Manufacturing.

[21]  Fu-Shiung Hsieh Analysis of Flexible Assembly Processes Based on Structural Decomposition of Petri Nets , 2007, IEEE Transactions on Systems, Man, and Cybernetics - Part A: Systems and Humans.

[22]  Jionghua Jin,et al.  State Space Modeling of Sheet Metal Assembly for Dimensional Control , 1999 .

[23]  R. Ramesh,et al.  Concurrent optimization of assembly tolerances for quality with position control using scatter search approach , 2007 .

[24]  Thomas L. DeFazio,et al.  Simplified generation of all mechanical assembly sequences , 1987, IEEE Journal on Robotics and Automation.

[25]  David Ben-Arieh,et al.  Analysis of assembly operations difficulty: a fuzzy expert system approach , 1993, J. Intell. Manuf..

[26]  S. Jack Hu,et al.  Automated generation of assembly system-design solutions , 2005, IEEE Transactions on Automation Science and Engineering.

[27]  Richard A. Wysk,et al.  An investigation of a human material handler on part flow in automated manufacturing systems , 2006, IEEE Transactions on Systems, Man, and Cybernetics - Part A: Systems and Humans.

[28]  Darek Ceglarek,et al.  Quality-driven Sequence Planning and Line Configuration Selection for Compliant Structure Assemblies , 2005 .

[29]  Darek Ceglarek,et al.  Design Evaluation of Sheet Metal Joints for Dimensional Integrity , 1998 .

[30]  Jeffrey E. Fernandez,et al.  ACCESSIBILITY AND ERGONOMIC ANALYSIS OF ASSEMBLY PRODUCT AND JIG DESIGNS , 1999 .

[31]  G. Boothroyd Design for assembly—The key to design for manufacture , 1987 .

[32]  Kyung S. Park Human Reliability: Analysis, Prediction, and Prevention of Human Errors , 1986 .

[33]  Alain Delchambre,et al.  An integrated approach for product family and assembly system design , 2003, IEEE Trans. Robotics Autom..

[34]  Yu Ding,et al.  Process-oriented tolerancing for multi-station assembly systems , 2005 .

[35]  J. J. Aguilar,et al.  Analysis, characterization and accuracy improvement of optical coordinate measurement systems for car body assembly quality control , 2006 .

[36]  Weijun Zhang,et al.  Dynamic scheduling in flexible assembly system based on timed Petri nets model , 2005 .

[37]  Daniel E. Whitney,et al.  Aids for the design or choice of assembly sequences , 1989, Conference Proceedings., IEEE International Conference on Systems, Man and Cybernetics.

[38]  Bai Zhang,et al.  Adaptive Product, Process and Tooling Design Strategy for Optimal Dimensional Quality of Automotive Body Assemblies , 2003 .

[39]  C. M. Hinckley,et al.  A global conformance quality model. A new strategic tool for minimizing defects caused by variation, error, and complexity , 1994 .

[40]  Yu Ding,et al.  A characterization of diagnosability conditions for variance components analysis in assembly operations , 2005, IEEE Transactions on Automation Science and Engineering.

[41]  Wang Hua,et al.  Application of wavelet analysis to BIW assembly quality evaluation , 2008, Int. J. Manuf. Technol. Manag..