Reliability Analysis of a Fleet of Loaders in Sangan Iron Mine

As the size and complexity of open pit mining equipment continue to increase, the implications of equipment failure become ever more critical. Unplanned equipment failures and their consequences have significant influence on the total operating cost of a mining system. Keeping this in view, a reliability study has been performed for a fleet of loaders in Sangan iron mine of Iran. In this study, two approaches were considered for analyze maintenance data, namely a basic maintenance approach and a reliability based approach. In this paper, trend and serial correlation test were used to validate the assumption of independent and identically distribution. K-S test was carried out with the aid of Easy-Fit software to select best fit distribution. Finally, reliability the loaders 560 No. 1, 560 No. 2 and 4400 for the next 50 hours of operation have been predicted, 5.1×10 -3 , 8.3×10 -3 and 1.2×10 -4 , respectively. To achieving the high reliability a review on maintenance program must be performed.

[1]  Uday Kumar,et al.  Reliability investigation for a fleet of load haul dump machines in a Swedish mine , 1989 .

[2]  Averill M. Law,et al.  Simulation Modeling and Analysis , 1982 .

[3]  Shelemyahu Zacks Introduction to reliability analysis , 1991 .

[4]  T. O. Oyebisi,et al.  On reliability and maintenance management of electronic equipment in the tropics , 2000 .

[5]  Uday Kumar,et al.  Reliability analysis of hydraulic systems of LHD machines using the power law process model , 1992 .

[6]  Nick Vagenas,et al.  A methodology for maintenance analysis of mining equipment , 1997 .

[7]  Uday Kumar,et al.  Reliability analysis of mining equipment: A case study of a crushing plant at Jajarm Bauxite Mine in Iran , 2008, Reliab. Eng. Syst. Saf..

[8]  J. Paraszczak,et al.  Reliability of diesel powered load-haul-dump machines in an underground Quebec mine , 1994 .

[9]  Vallayil N. A. Naikan,et al.  Maintainability and reliability analysis of a fleet of shovels , 2001 .

[10]  N. Vagenas,et al.  A software architecture for reliability analysis of mining equipment , 2000 .

[11]  Uday Kumar,et al.  Reliability technique : a powerful tool for mine operators , 1988 .

[12]  Richard L. Scheaffer,et al.  Probability and statistics for engineers , 1986 .

[13]  S. K. Samanta,et al.  Reliability modelling and performance analyses of an LHD system in mining , 2004 .

[14]  Nick Vagenas,et al.  Applying a Maintenance Methodology for Excavation Reliability , 2003 .

[15]  Mohsen Safari,et al.  Mineral processing plant location using the analytic hierarchy process——a case study:the Sangan iron ore mine(phase 1) , 2010 .

[16]  Nick Vagenas,et al.  Analysis of truck maintenance characteristics in a Swedish open pit mine , 1994 .

[17]  Laeeque K. Daneshmend,et al.  Reliability Modelling of Surface Mining Equipment: Data Gathering and Analysis Methodologies , 2003 .