Composite reliability evaluation for large-scale power systems

This paper presents in details a special framework, based on pseudo-chronological Monte Carlo simulation, for assessing composite reliability indices of large-scale power systems. Bearing in mind both accuracy and computational effort, the effects of the size and characteristics of the system areas on the reliability indices will be investigated. Case studies on the IEEE-RTS-1996 and on the Canadian system are presented and discussed.

[1]  Roy Billinton,et al.  Reliability issues in today's electric power utility environment , 1997 .

[2]  A. M. Leite da Silva,et al.  A conditional probability approach to the calculation of frequency and duration indices in composite reliability evaluation , 1993 .

[3]  S. Deckmann,et al.  Real-Time External Equivalents for Static Security Analysis , 1979, IEEE Transactions on Power Apparatus and Systems.

[4]  J. B. Ward Equivalent Circuits for Power-Flow Studies , 1949, Transactions of the American Institute of Electrical Engineers.

[5]  A. M. Leite da Silva,et al.  Efficient loss-of-load cost evaluation by combined pseudo-sequential and state transition simulation , 1997 .

[6]  George J. Anders,et al.  Optimal outage scheduling: example of application to a large power system , 2003 .

[7]  Probability Subcommittee,et al.  IEEE Reliability Test System , 1979, IEEE Transactions on Power Apparatus and Systems.

[8]  R. N. Allan,et al.  Reliability assessment of composite hydrothermal generation and transmission systems using sequential simulation , 1994 .

[9]  A. M. Leite da Silva,et al.  Frequency and duration calculations in composite generation and transmission reliability evaluation , 1992 .

[10]  A. M. Leite da Silva,et al.  Evaluation of reliability worth in composite systems based on pseudo-sequential Monte Carlo simulation , 1994 .

[11]  Roy Billinton,et al.  Sequential Monte Carlo simulation for composite power system reliability analysis with time varying loads , 1995 .

[12]  Roy Billinton,et al.  Pseudo-chronological simulation for composite reliability analysis with time varying loads , 2000 .

[13]  Roy Billinton,et al.  A system state transition sampling method for composite system reliability evaluation , 1993 .

[14]  N. J. Balu,et al.  Composite generation/transmission reliability evaluation , 1992, Proc. IEEE.