ForBAU The virtual construction site project

The paper introduces the Bavarian research cluster ForBAU which has been launched in January 2008 with the aim of an improved planning and management of construction sites, especially in infrastructure projects. To realize this goal, the research cluster focuses on developing a virtual representation of the construction site which involves all essential aspects, including models of the buildings under construction, the environmental boundary conditions, the construction procedure, the logistics processes, and the required resources. The resulting virtual construction site forms one the one hand the basis for simulating the construction process, which allows to identify critical aspects of the construction project in advance and to adapt the resources and the scheduling accordingly. On the other hand, the holistic virtual representation of the real construction site is used during the execution phase to capture all available information about the project – enabling site managers, controllers and engineers to get a detailed overview on its progress and identify potential problems in an early stage.

[1]  Börner Anko,et al.  MFC: a modular line camera for 3D world modulling , 2008 .

[2]  Ghang Lee,et al.  Parametric 3D modeling in building construction with examples from precast concrete , 2004 .

[3]  C. Katz,et al.  Parametric Description of Bridge Structures , 2008 .

[4]  Karsten Scheibe,et al.  MFC - A Modular Line Camera for 3D World Modulling , 2008, RobVis.

[5]  Gerd Hirzinger,et al.  Energy-efficient Autonomous Four-rotor Flying Robot Controlled at 1 kHz , 2007, Proceedings 2007 IEEE International Conference on Robotics and Automation.

[6]  A Kiviniemi,et al.  Integration of Multiple Product Models: IFC Model Servers as a Potential Solution , 2005 .

[7]  Gerd Hirzinger,et al.  Stereo Vision Based Reconstruction of Huge Urban Areas from an Airborne Pushbroom Camera (HRSC) , 2005, DAGM-Symposium.

[8]  Ernst Rank,et al.  A Pattern-Based Approach for Facilitating Schedule Generation and Cost Analysis in Bridge Construction Projects , 2009 .

[9]  Nobuyoshi Yabuki,et al.  INTERNATIONAL COLLABORATION FOR DEVELOPING THE BRIDGE PRODUCT MODEL "IFC-BRIDGE" , 2006 .

[10]  Willibald A. Günthner,et al.  Using Product Data Management Systems for Civil Engineering Projects - Potentials and Obstacles , 2009 .

[11]  Willibald A. Günthner,et al.  An Integrated 3D Simulation Framework for Earthwork Processes , 2009 .

[12]  J. Chilès,et al.  Geostatistics: Modeling Spatial Uncertainty , 1999 .

[13]  H. Hirschmüller Accurate and Efficient Stereo Processing by Semi-Global Matching and Mutual Information , 2005, CVPR.