ForBAU The virtual construction site project
暂无分享,去创建一个
[1] Börner Anko,et al. MFC: a modular line camera for 3D world modulling , 2008 .
[2] Ghang Lee,et al. Parametric 3D modeling in building construction with examples from precast concrete , 2004 .
[3] C. Katz,et al. Parametric Description of Bridge Structures , 2008 .
[4] Karsten Scheibe,et al. MFC - A Modular Line Camera for 3D World Modulling , 2008, RobVis.
[5] Gerd Hirzinger,et al. Energy-efficient Autonomous Four-rotor Flying Robot Controlled at 1 kHz , 2007, Proceedings 2007 IEEE International Conference on Robotics and Automation.
[6] A Kiviniemi,et al. Integration of Multiple Product Models: IFC Model Servers as a Potential Solution , 2005 .
[7] Gerd Hirzinger,et al. Stereo Vision Based Reconstruction of Huge Urban Areas from an Airborne Pushbroom Camera (HRSC) , 2005, DAGM-Symposium.
[8] Ernst Rank,et al. A Pattern-Based Approach for Facilitating Schedule Generation and Cost Analysis in Bridge Construction Projects , 2009 .
[9] Nobuyoshi Yabuki,et al. INTERNATIONAL COLLABORATION FOR DEVELOPING THE BRIDGE PRODUCT MODEL "IFC-BRIDGE" , 2006 .
[10] Willibald A. Günthner,et al. Using Product Data Management Systems for Civil Engineering Projects - Potentials and Obstacles , 2009 .
[11] Willibald A. Günthner,et al. An Integrated 3D Simulation Framework for Earthwork Processes , 2009 .
[12] J. Chilès,et al. Geostatistics: Modeling Spatial Uncertainty , 1999 .
[13] H. Hirschmüller. Accurate and Efficient Stereo Processing by Semi-Global Matching and Mutual Information , 2005, CVPR.