Construction and demolition materials management in Hong Kong
暂无分享,去创建一个
[1] A. S. Al-Harthy,et al. An overview of waste materials recycling in the Sultanate of Oman , 2004 .
[2] Ni-Bin Chang,et al. Recycling of construction and demolition waste via a mechanical sorting process , 2002 .
[3] Ming Lu,et al. Application Framework for Mapping and Simulation of Waste Handling Processes in Construction , 2006 .
[4] Chi S. Poon. MANAGEMENT AND RECYCLING OF DEMOLITION WASTE IN HONG KONG , 1997 .
[5] Ann T. W. Yu,et al. On-site sorting of construction and demolition waste in Hong Kong , 2001 .
[6] Albert T. Yeung,et al. Use of inert C&D materials for seawall foundation: A field-scale pilot test , 2006 .
[7] C. Poon,et al. USE OF RECYCLED AGGREGATES IN MOLDED CONCRETE BRICKS AND BLOCKS , 2002 .
[8] Chi Sun Poon,et al. Paving blocks made with recycled concrete aggregate and crushed clay brick , 2006 .
[9] Konstantinos Moustakas,et al. Generation and management of construction and demolition waste in Greece—an existing challenge , 2003 .
[10] Nabil Kartam,et al. Environmental management of construction and demolition waste in Kuwait. , 2004, Waste management.
[11] Gordon Pei,et al. Use of inert C&D materials for seawall foundation: quality control measures. , 2007, Waste management.
[12] Chi S. Poon,et al. Management and Recycling of Demolition Waste in Hong Kong , 1997 .