Optimizing Disruption Recovery Operations for Wind Farms considering Power Generation Loss and Repair Time Uncertainty

The development of wind power in China shows a dramatic growth in the past decade in terms of installed capacity. However, wind power companies mainly focus on the construction of new wind farms continuously, while operations management once wind farms are built is seldom paid attention to. The problem is crucial for ensuring efficient power generation, especially when wind turbines’ performance declines over time and disruption/failure often occurs. Efficient disruption recovery operations are critical for restoring the failures of wind turbine generators as fast as possible. This paper aims to optimize the disruption recovery operations for wind farms by determining the maintenance schedule and route for multiple maintenance teams. This optimization problem is formulated as a deterministic mixed integer linear programming model with the objective of minimizing the loss of power generation due to failure. In view of the high uncertainty of repair time, a chance-constrained programming model and a cutting-plane solution algorithm are further proposed. A case study based on a real wind farm demonstrates (1) the proposed model is applicable for solving real-world-sized problems; (2) the optimal maintenance route often shows a crossing pattern, which is quite different from that of traditional vehicle routing problems; and (3) the working time limit violation for maintenance teams due to uncertain repair time can be effectively avoided. Overall, the proposed optimization model provides decision-making support for wind farm maintenance work and shows a great potential in wind farm energy management.

[1]  J. Rubio-Romero,et al.  A model for the preventive maintenance scheduling of power plants including wind farms , 2013, Reliab. Eng. Syst. Saf..

[2]  Nabiha Haouas,et al.  Wind Farm Power Forecasting , 2013 .

[3]  Jong-Chan Kim,et al.  Improvement of MPPT Control Performance Using Fuzzy Control and VGPI in the PV System for Micro Grid , 2019, Sustainability.

[4]  David Pisinger,et al.  Optimizing wind farm cable routing considering power losses , 2017, Eur. J. Oper. Res..

[5]  Zhe Chen,et al.  Operation and Control of a DC-Grid Offshore Wind Farm Under DC Transmission System Faults , 2013, IEEE Transactions on Power Delivery.

[6]  M. Shafiee Maintenance logistics organization for offshore wind energy: Current progress and future perspectives , 2015 .

[7]  Daniele Vigo,et al.  A Multi-Depot Two-Echelon Vehicle Routing Problem with Delivery Options Arising in the Last Mile Distribution , 2018, Eur. J. Oper. Res..

[8]  Magnus Stålhane,et al.  Routing and Scheduling of Maintenance Fleet for Offshore Wind Farms , 2015 .

[9]  David M. Miller,et al.  An Integrated Spatial DSS for Scheduling and Routing Home-Health-Care Nurses , 1997 .

[10]  Karina H. Kjeldsen Classification of Ship Routing and Scheduling Problems in Liner Shipping , 2011, INFOR Inf. Syst. Oper. Res..

[11]  Michel Gendreau,et al.  An adaptive large neighborhood search for the two-echelon multiple-trip vehicle routing problem with satellite synchronization , 2016, Eur. J. Oper. Res..

[12]  FikarChristian,et al.  Home health care routing and scheduling , 2017 .

[13]  Zhe Chen,et al.  A Review of the State of the Art of Power Electronics for Wind Turbines , 2009, IEEE Transactions on Power Electronics.

[14]  Amedeo R. Odoni,et al.  Optimizing Bus Bridging Services in Response to Disruptions of Urban Transit Rail Networks , 2016, Transp. Sci..

[15]  Zong Woo Geem,et al.  Improved Formulation for the Optimization of Wind Turbine Placement in a Wind Farm , 2013 .

[16]  Patrick Hirsch,et al.  Home health care routing and scheduling: A review , 2017, Comput. Oper. Res..

[17]  Frede Blaabjerg,et al.  Wind farm—A power source in future power systems , 2009 .

[18]  Zihua Zhang,et al.  Failure Analysis of Large-Scale Wind Power Structure under Simulated Typhoon , 2014 .

[19]  Jun-Ho Huh,et al.  Hybrid Advanced Metering Infrastructure Design for Micro Grid Using the Game Theory Model , 2015 .

[20]  Cynthia Barnhart,et al.  Planning for Robust Airline Operations: Optimizing Aircraft Routings and Flight Departure Times to Minimize Passenger Disruptions , 2006, Transp. Sci..

[21]  Kaikai Pan,et al.  Probabilistic Short-Term Wind Power Forecasting Using Sparse Bayesian Learning and NWP , 2015 .

[22]  Eric Wibisono,et al.  Multi-objective evolutionary algorithm for a ship routing problem in maritime logistics collaboration , 2017 .

[23]  Magnus Stålhane,et al.  Optimization of routing and scheduling of vessels to perform maintenance at offshore wind farms , 2015 .

[24]  Chandra Ade Irawan,et al.  Optimisation of maintenance routing and scheduling for offshore wind farms , 2017, Eur. J. Oper. Res..

[25]  Maria Paola Scaparra,et al.  A hierarchical compromise model for the joint optimization of recovery operations and distribution of emergency goods in Humanitarian Logistics , 2014, Comput. Oper. Res..

[26]  Bikash Kumar Sahu Wind energy developments and policies in China: A short review , 2018 .

[27]  Volker Windeck A Liner Shipping Network Design , 2012 .

[28]  Darko Bozanic,et al.  Green logistic vehicle routing problem: Routing light delivery vehicles in urban areas using a neuro-fuzzy model , 2014, Expert Syst. Appl..

[29]  Christian Bierwirth,et al.  The home health care routing and scheduling problem with interdependent services , 2014, Health care management science.