Safety regulation changes during projects: the use of system dynamics to quantify the effects of change

Uncontrolled change can have an important effect on large design and development projects. Such effects are systemic and so are difficult to quantify. One particular source of change that can have a major effect is changes to safety regulations. The risk of such change needs to be recognised and quantified. This paper highlights this risk by describing two transport manufacturing projects that were evaluated post mortem as part of claims procedures. The types of effects caused are described, as are the issues involved in their quantification. Traditional tools were inadequate to quantify these effects. The use of System Dynamics is described to demonstrate the project dynamics, to model the inter-relationships between factors and to quantify their combined effect. This technique can be used for many areas of project modelling.

[1]  C. Eden,et al.  On the nature of problems in consulting practice , 1979 .

[2]  Fran Ackermann,et al.  Vicious circles of parallelism , 1995 .

[3]  Liz Clarke,et al.  The Essence of Change , 1994 .

[4]  Terry Williams,et al.  System dynamics in project management: assessing the impacts of client behaviour on project performance , 1998, J. Oper. Res. Soc..

[5]  Fran Ackermann,et al.  The Effects of Design Changes and Delays on Project Costs , 1995 .

[6]  S Payne TIGHTENING THE GRIP ON PASSENGER SHIP SAFETY: THE EVOLUTION OF SOLAS , 1994 .

[7]  Peter W. G. Morris,et al.  The Anatomy of Major Projects , 1987 .

[8]  S. Scott Dealing with delay claims: a survey , 1993 .

[9]  T. M. Williams Holistic methods in project management , 1995 .

[10]  Eric F. Wolstenholme,et al.  System Enquiry: A System Dynamics Approach , 1990 .

[11]  Colin Eden,et al.  Dismantling the learning curve: the role of learning in understanding disruption , 1994 .

[12]  John Bowers,et al.  The role of system dynamics in project management , 1996 .

[13]  Karlos Artto,et al.  Managing Risks in Projects , 1998 .

[14]  Unny Menon,et al.  Concurrent engineering : concepts, implementation and practice , 1994 .

[15]  Terry M Willams,et al.  Using a risk register to integrate risk management in project definition , 1994 .

[16]  Fran Ackermann,et al.  Modeling for Litigation: Mixing Qualitative and Quantitative Approaches , 1997 .

[17]  Terry Williams,et al.  The Need for New Paradigms for Complex Projects , 1999 .

[18]  V Martin Planning for change. , 2000, Nursing management.

[19]  D. J. Taylor,et al.  The Cormorant Field, Blocks 211/21a, 211/26a, UK North Sea , 1991, Geological Society, London, Memoirs.