Commissioning results of single bunch selection system for the RAON heavy-ion accelerator facility
暂无分享,去创建一个
[1] R. Ferdinand,et al. Proton beam commissioning of the SPIRAL2 Single Bunch Selector , 2020, Journal of Instrumentation.
[2] R. Ferdinand,et al. Status of the SPIRAL2 Project , 2019 .
[3] I. Eliyahu,et al. Fast chopper for single radio-frequency quadrupole bunch selection for neutron time-of-flight capabilities , 2019, Physical Review Accelerators and Beams.
[4] D. Bar,et al. Fast beam chopper at SARAF accelerator via RF deflector before RFQ , 2012 .
[5] I. Katayama,et al. Low-background prebunching system for heavy-ion beams at the Tokai radioactive ion accelerator complex , 2012 .