Two branch and bound algorithms for the permutation flow shop problem

[1]  Chris N. Potts,et al.  An adaptive branching rule for the permutation flow-shop problem , 1980 .

[2]  B. J. Lageweg,et al.  A General Bounding Scheme for the Permutation Flow-Shop Problem , 1978, Oper. Res..

[3]  Jacques Carlier,et al.  Ordonnancements à contraintes disjonctives , 1978 .

[4]  J. Carlier The one-machine sequencing problem , 1982 .

[5]  C. Monma,et al.  A concise survey of efficiently solvable special cases of the permutation flow-shop problem , 1983 .

[6]  E. Pinson Le probleme de job-shop , 1988 .

[7]  Chris N. Potts,et al.  Flow shop scheduling with lot streaming , 1989 .

[8]  A. Hertz,et al.  A new heuristic method for the flow shop sequencing problem , 1989 .

[9]  J. Carlier,et al.  An algorithm for solving the job-shop problem , 1989 .

[10]  Eugene L. Lawler,et al.  Sequencing and scheduling: algorithms and complexity , 1989 .

[11]  Jacek Blazewicz,et al.  Scheduling in Computer and Manufacturing Systems , 1990 .

[12]  Eric Pinson,et al.  A Practical Use of Jackson''s Preemptive Schedule for Solving the Job-Shop Problem. Annals of Opera , 1991 .

[13]  Jatinder N. D. Gupta,et al.  Flowshop scheduling with set-up, processing and removal times separated , 1991 .

[14]  Erik Demeulemeester,et al.  A branch-and-bound procedure for the multiple resource-constrained project scheduling problem , 1992 .

[15]  Haldun Süral,et al.  Scheduling unit-time tasks in renewable resource constrained flowshops , 1992, ZOR Methods Model. Oper. Res..

[16]  Algorithmes de résolution exacte et heuristique pour les problèmes d'ordonnancement en FlowShop , 1992 .

[17]  Éric D. Taillard,et al.  Benchmarks for basic scheduling problems , 1993 .

[18]  Graham McMahon,et al.  The two-machine flow shop problem with arbitrary precedence relations , 1993 .

[19]  Chung-Yee Lee,et al.  Minimizing the makespan in the 3-machine assembly-type flowshop scheduling problem , 1993 .

[20]  Peter Brucker,et al.  A Branch and Bound Algorithm for the Job-Shop Scheduling Problem , 1994, Discret. Appl. Math..

[21]  J. Carlier,et al.  Adjustment of heads and tails for the job-shop problem , 1994 .

[22]  Graham K. Rand,et al.  Logistics of Production and Inventory , 1995 .