Issues in the use, design and evolution of process scheduling and planning systems
暂无分享,去创建一个
Gintaras V. Reklaitis | Joseph F. Pekny | G. E. Applequist | O. Samikoglu | G. Reklaitis | J. Pekny | G. Applequist | Ö. Samikoglu
[1] Mitsuo Gen,et al. A tutorial survey of job-shop scheduling problems using genetic algorithms—I: representation , 1996 .
[2] Chuen-Lung Chen,et al. Genetic algorithms applied to the continuous flow shop problem , 1996 .
[3] Ali Elkamel. Scheduling of process operations using mathematical programming techniques: Towards a prototype decision support system , 1993 .
[4] Gintaras V. Reklaitis,et al. Perspectives on model based integration of process operations , 1996 .
[5] Gintaras V. Reklaitis,et al. Practical considerations in using model-based optimization for the scheduling and planning of batch/semicontinuous processes , 1994 .
[6] Gintaras V. Reklaitis,et al. An Interval-Based Mathematical Model for the Scheduling of Resource-Constrained Batch Chemical Processes , 1996 .
[7] J. Pekny,et al. Exact solution of the no-wait flowshop scheduling problem with a comparison to heuristic methods , 1991 .
[8] David W.T. Rippin,et al. Simulation of single- and multiproduct batch chemical plants for optimal design and operation☆ , 1983 .
[9] David W.T. Rippin,et al. Batch process systems engineering: A retrospective and prospective review , 1993 .
[10] Steven H. Rich,et al. Multiple routings and reaction paths in project scheduling , 1987 .
[11] C. Pantelides,et al. A simple continuous-time process scheduling formulation and a novel solution algorithm , 1996 .
[12] G. Reklaitis,et al. Mathematical programming formulation for scheduling of batch operations based on nonuniform time discretization , 1997 .
[13] Matthew H. Bassett,et al. Decomposition techniques for the solution of large-scale scheduling problems , 1996 .
[14] Chonghun Han,et al. Intelligent systems in process engineering : A review , 1996 .
[15] Virginio Chiodini,et al. Configurable on-line scheduling , 1996 .
[16] Donald L. Miller,et al. Exact Solution of Large Asymmetric Traveling Salesman Problems , 1991, Science.
[17] John H. Holland,et al. Adaptation in Natural and Artificial Systems: An Introductory Analysis with Applications to Biology, Control, and Artificial Intelligence , 1992 .
[18] H. Das,et al. Scheduling of serial multiproduct batch processes via simulated annealing , 1990 .
[19] Jaime Cerdá,et al. A knowledge-based approach to production scheduling for batch processes , 1996 .
[20] Alan S. Manne,et al. On the Job-Shop Scheduling Problem , 1960 .
[21] Steven H. Rich,et al. Scheduling and sequencing of batch operations in a multipurpose plant , 1986 .
[22] Gintaras V. Reklaitis,et al. A framework for investigating schedule robustness under uncertainty , 1995 .
[23] T. E. Baker,et al. A History of Mathematical Programming in the Petroleum Industry , 1990 .
[24] James C. Bean,et al. Genetic Algorithms and Random Keys for Sequencing and Optimization , 1994, INFORMS J. Comput..
[25] H. Ku,et al. Scheduling in serial multiproduct batch processes with finite interstage storage: mixed integer linear program formulation , 1988 .
[26] Laurence A. Wolsey,et al. Integer and Combinatorial Optimization , 1988, Wiley interscience series in discrete mathematics and optimization.
[27] H. Ku,et al. An evaluation of simulated annealing for batch process scheduling , 1991 .
[28] Philip M. Wolfe,et al. Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach , 1969 .
[29] D. Rippin,et al. Production planning and scheduling for multi-purpose batch chemical plants , 1979 .
[30] G. Reklaitis,et al. Scheduling of multipurpose batch chemical plants. 1. Formation of single-product campaigns , 1991 .
[31] G. Reklaitis,et al. Scheduling network flowshops so as to minimize makespan , 1989 .
[32] R. Sargent,et al. A general algorithm for short-term scheduling of batch operations—II. Computational issues , 1993 .
[33] G. Reklaitis,et al. HEURISTIC ALGORITHM FOR SCHEDULING BATCH AND SEMI-CONTINUOUS PLANTS WITH PRODUCTION DEADLINES, INTERMEDIATE STORAGE LIMITATIONS AND EQUIPMENT CHANGEOVER COSTS , 1994 .
[34] S. S. Panwalkar,et al. A Survey of Scheduling Rules , 1977, Oper. Res..
[35] Joseph F. Pekny,et al. An exact parallel algorithm for scheduling when production costs depend on consecutive system states , 1990 .
[36] David S. Johnson,et al. Computers and Intractability: A Guide to the Theory of NP-Completeness , 1978 .
[37] J. M. Pinto,et al. A Continuous Time Mixed Integer Linear Programming Model for Short Term Scheduling of Multistage Batch Plants , 1995 .
[38] Ignacio E. Grossmann,et al. Efficient optimization algorithms for zero wait scheduling of multiproduct batch plants , 1989 .
[39] G. Reklaitis,et al. Continuous time representation in batch/semicontinuous process scheduling: Randomized heuristics approach , 1996 .
[40] S. Martello,et al. Algorithms for Knapsack Problems , 1987 .
[41] Richard S. H. Mah,et al. An implicit enumeration scheme for the flowshop problem with no intermediate storage , 1981 .
[42] C. Pantelides,et al. Optimal Campaign Planning/Scheduling of Multipurpose Batch/Semicontinuous Plants. 2. A Mathematical Decomposition Approach , 1996 .
[43] E. H. Bowman. THE SCHEDULE-SEQUENCING PROBLEM* , 1959 .
[44] G. Reklaitis,et al. DESIGN OF BATCH CHEMICAL PLANTS UNDER MARKET UNCERTAINTY , 1994 .
[45] Mark S. Fox,et al. Constraint guided scheduling—a short history of research at CMU , 1990 .
[46] Peter T. Cummings,et al. Flowshop sequencing with non-permutation schedules , 1991 .
[47] Gintaras V. Reklaitis,et al. Optimal schedule generation for a single-product production line. I: Problem formulation , 1989 .
[48] E. Kondili,et al. A General Algorithm for Scheduling Batch Operations , 1988 .
[49] G. Reklaitis,et al. Multiproduct plant scheduling studies using BOSS , 1987 .