Issues in the use, design and evolution of process scheduling and planning systems

[1]  Mitsuo Gen,et al.  A tutorial survey of job-shop scheduling problems using genetic algorithms—I: representation , 1996 .

[2]  Chuen-Lung Chen,et al.  Genetic algorithms applied to the continuous flow shop problem , 1996 .

[3]  Ali Elkamel Scheduling of process operations using mathematical programming techniques: Towards a prototype decision support system , 1993 .

[4]  Gintaras V. Reklaitis,et al.  Perspectives on model based integration of process operations , 1996 .

[5]  Gintaras V. Reklaitis,et al.  Practical considerations in using model-based optimization for the scheduling and planning of batch/semicontinuous processes , 1994 .

[6]  Gintaras V. Reklaitis,et al.  An Interval-Based Mathematical Model for the Scheduling of Resource-Constrained Batch Chemical Processes , 1996 .

[7]  J. Pekny,et al.  Exact solution of the no-wait flowshop scheduling problem with a comparison to heuristic methods , 1991 .

[8]  David W.T. Rippin,et al.  Simulation of single- and multiproduct batch chemical plants for optimal design and operation☆ , 1983 .

[9]  David W.T. Rippin,et al.  Batch process systems engineering: A retrospective and prospective review , 1993 .

[10]  Steven H. Rich,et al.  Multiple routings and reaction paths in project scheduling , 1987 .

[11]  C. Pantelides,et al.  A simple continuous-time process scheduling formulation and a novel solution algorithm , 1996 .

[12]  G. Reklaitis,et al.  Mathematical programming formulation for scheduling of batch operations based on nonuniform time discretization , 1997 .

[13]  Matthew H. Bassett,et al.  Decomposition techniques for the solution of large-scale scheduling problems , 1996 .

[14]  Chonghun Han,et al.  Intelligent systems in process engineering : A review , 1996 .

[15]  Virginio Chiodini,et al.  Configurable on-line scheduling , 1996 .

[16]  Donald L. Miller,et al.  Exact Solution of Large Asymmetric Traveling Salesman Problems , 1991, Science.

[17]  John H. Holland,et al.  Adaptation in Natural and Artificial Systems: An Introductory Analysis with Applications to Biology, Control, and Artificial Intelligence , 1992 .

[18]  H. Das,et al.  Scheduling of serial multiproduct batch processes via simulated annealing , 1990 .

[19]  Jaime Cerdá,et al.  A knowledge-based approach to production scheduling for batch processes , 1996 .

[20]  Alan S. Manne,et al.  On the Job-Shop Scheduling Problem , 1960 .

[21]  Steven H. Rich,et al.  Scheduling and sequencing of batch operations in a multipurpose plant , 1986 .

[22]  Gintaras V. Reklaitis,et al.  A framework for investigating schedule robustness under uncertainty , 1995 .

[23]  T. E. Baker,et al.  A History of Mathematical Programming in the Petroleum Industry , 1990 .

[24]  James C. Bean,et al.  Genetic Algorithms and Random Keys for Sequencing and Optimization , 1994, INFORMS J. Comput..

[25]  H. Ku,et al.  Scheduling in serial multiproduct batch processes with finite interstage storage: mixed integer linear program formulation , 1988 .

[26]  Laurence A. Wolsey,et al.  Integer and Combinatorial Optimization , 1988, Wiley interscience series in discrete mathematics and optimization.

[27]  H. Ku,et al.  An evaluation of simulated annealing for batch process scheduling , 1991 .

[28]  Philip M. Wolfe,et al.  Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach , 1969 .

[29]  D. Rippin,et al.  Production planning and scheduling for multi-purpose batch chemical plants , 1979 .

[30]  G. Reklaitis,et al.  Scheduling of multipurpose batch chemical plants. 1. Formation of single-product campaigns , 1991 .

[31]  G. Reklaitis,et al.  Scheduling network flowshops so as to minimize makespan , 1989 .

[32]  R. Sargent,et al.  A general algorithm for short-term scheduling of batch operations—II. Computational issues , 1993 .

[33]  G. Reklaitis,et al.  HEURISTIC ALGORITHM FOR SCHEDULING BATCH AND SEMI-CONTINUOUS PLANTS WITH PRODUCTION DEADLINES, INTERMEDIATE STORAGE LIMITATIONS AND EQUIPMENT CHANGEOVER COSTS , 1994 .

[34]  S. S. Panwalkar,et al.  A Survey of Scheduling Rules , 1977, Oper. Res..

[35]  Joseph F. Pekny,et al.  An exact parallel algorithm for scheduling when production costs depend on consecutive system states , 1990 .

[36]  David S. Johnson,et al.  Computers and Intractability: A Guide to the Theory of NP-Completeness , 1978 .

[37]  J. M. Pinto,et al.  A Continuous Time Mixed Integer Linear Programming Model for Short Term Scheduling of Multistage Batch Plants , 1995 .

[38]  Ignacio E. Grossmann,et al.  Efficient optimization algorithms for zero wait scheduling of multiproduct batch plants , 1989 .

[39]  G. Reklaitis,et al.  Continuous time representation in batch/semicontinuous process scheduling: Randomized heuristics approach , 1996 .

[40]  S. Martello,et al.  Algorithms for Knapsack Problems , 1987 .

[41]  Richard S. H. Mah,et al.  An implicit enumeration scheme for the flowshop problem with no intermediate storage , 1981 .

[42]  C. Pantelides,et al.  Optimal Campaign Planning/Scheduling of Multipurpose Batch/Semicontinuous Plants. 2. A Mathematical Decomposition Approach , 1996 .

[43]  E. H. Bowman THE SCHEDULE-SEQUENCING PROBLEM* , 1959 .

[44]  G. Reklaitis,et al.  DESIGN OF BATCH CHEMICAL PLANTS UNDER MARKET UNCERTAINTY , 1994 .

[45]  Mark S. Fox,et al.  Constraint guided scheduling—a short history of research at CMU , 1990 .

[46]  Peter T. Cummings,et al.  Flowshop sequencing with non-permutation schedules , 1991 .

[47]  Gintaras V. Reklaitis,et al.  Optimal schedule generation for a single-product production line. I: Problem formulation , 1989 .

[48]  E. Kondili,et al.  A General Algorithm for Scheduling Batch Operations , 1988 .

[49]  G. Reklaitis,et al.  Multiproduct plant scheduling studies using BOSS , 1987 .