Multi-objective process planning and scheduling using controlled elitist non-dominated sorting genetic algorithm
暂无分享,去创建一个
Manoj Kumar Tiwari | P. Mohapatra | Ashutosh Nayak | Sri Krishna Kumar | M. Tiwari | A. Nayak | M. Tiwari | P. Mohapatra | S. K. Kumar | S.K. Kumar | Ashutosh Nayak
[1] Guan-Chun Luh,et al. MOIA: Multi-objective immune algorithm , 2003 .
[2] Mario Calderini,et al. A hierarchical bicriterion approach to integrated process plan selection and job shop scheduling , 1995 .
[3] Wenqiang Zhang,et al. Multiobjective process planning and scheduling using improved vector evaluated genetic algorithm with archive , 2012 .
[4] Qiao Lihong,et al. An improved genetic algorithm for integrated process planning and scheduling , 2012 .
[5] Lihui Wang,et al. GA-based adaptive setup planning toward process planning and scheduling integration , 2009 .
[6] Behrokh Khoshnevis,et al. Integration of process planning and scheduling functions , 1991, J. Intell. Manuf..
[7] Cevdet Gologlu,et al. Machine capability and fixturing constraints-imposed automatic machining set-ups generation , 2004 .
[8] Shensheng Zhang,et al. Modeling integrated CAPP/PPS systems , 2004, Comput. Ind. Eng..
[9] Yunfeng Zhang,et al. A PSO-based multi-objective optimization approach to the integration of process planning and scheduling , 2010, IEEE ICCA 2010.
[10] W. E. I. Ta N,et al. Integration of process planning and schedulingÐ a review , 2000 .
[11] Kalyanmoy Deb,et al. A fast and elitist multiobjective genetic algorithm: NSGA-II , 2002, IEEE Trans. Evol. Comput..
[12] Alexandre Dolgui,et al. Single machine scheduling with precedence constraints and positionally dependent processing times , 2012, Comput. Oper. Res..
[13] Parul Jain,et al. An integrated scheme for process planning and scheduling in FMS , 2006 .
[14] Liang Gao,et al. Application of game theory based hybrid algorithm for multi-objective integrated process planning and scheduling , 2012, Expert Syst. Appl..
[15] Yiming Rong,et al. Graph-based set-up planning and tolerance decomposition for computer-aided fixture design , 2001 .
[16] Andrew Y. C. Nee,et al. Reducing tardy jobs by integrating process planning and scheduling functions , 2009 .
[17] Alexandre Dolgui,et al. Graph approach for optimal design of transfer machine with rotary table , 2009 .
[18] Manoj Kumar Tiwari,et al. An adapted NSGA-2 algorithm based dynamic process plan generation for a reconfigurable manufacturing system , 2012, J. Intell. Manuf..
[19] Hong-Chao Zhang,et al. A hybrid-graph approach for automated setup planning in CAPP , 1999 .
[20] Andrew Y. C. Nee,et al. Hybrid GA and SA dynamic set-up planning optimization , 2002 .
[21] Liang Gao,et al. Integrated process planning and scheduling using an imperialist competitive algorithm , 2012 .
[22] Richard Y. K. Fung,et al. Integrated process planning and scheduling by an agent-based ant colony optimization , 2010, Comput. Ind. Eng..
[23] Lihui Wang,et al. Architecture design for distributed process planning , 2003 .
[24] Ghorbanali Mohammadi,et al. A multi-objective optimisation model to integrating flexible process planning and scheduling based on hybrid multi-objective simulated annealing , 2012 .
[25] Subbarao Kambhampati,et al. Planning and Scheduling , 1997, The Computer Science and Engineering Handbook.
[26] Jim Duggan,et al. Shop Floor Control Systems , 1991 .
[27] Jerry Y. H. Fuh,et al. Integration of process planning and scheduling by exploring the flexibility of process planning , 2003 .
[28] Samuel H. Huang,et al. Automatic set-up planning for metal cutting: an integrated methodology , 2003 .
[29] Markus Wagner,et al. Fast and effective multi-objective optimisation of wind turbine placement , 2013, GECCO '13.
[30] Y. Guoa,et al. Applications of particle swarm optimisation in integrated process planning and scheduling , 2008 .
[31] Jean-Pierre Kruth,et al. A computer aided process planning system that increases the flexibility of Manufacturing , 1992 .
[32] Bai Li,et al. Modeling integrated CAPP/PPS systems , 2004 .
[33] Kalyanmoy Deb,et al. Controlled Elitist Non-dominated Sorting Genetic Algorithms for Better Convergence , 2001, EMO.
[34] Arabinda Tripathy. Shop Floor Control Systems: From Design to Implementation , 1993 .
[35] Tao Zhang,et al. Scheduling in a flexible job shop with continuous operations at the last stage , 2016, J. Simulation.
[36] Behrokh Khoshnevis,et al. Scheduling with flexible process plans , 1993 .
[37] C. Saygin,et al. Integrating Flexible Process Plans with Scheduling in Flexible Manufacturing Systems , 1999 .
[38] D. Sarkar,et al. Pareto-optimal solutions for multi-objective optimization of fed-batch bioreactors using nondominated sorting genetic algorithm. , 2005 .
[39] P. Asokan,et al. A GRASP algorithm for the Integration of Process Planning and Scheduling in a flexible job-shop , 2010, Int. J. Manuf. Res..
[40] Alexandre Dolgui,et al. Combinatorial design of a minimum cost transfer line with parallel operations at workstations , 2007 .
[41] Samuel H. Huang,et al. A progressive approach for the integration of process planning and scheduling , 1995 .