CONTRACTOR PERSPECTIVE ON TIME OVERRUN FACTORS IN MALAYSIAN CONSTRUCTION PROJECTS

Time overrun has become a major concern in construction projects worldwide including Malaysia. The occurrence of the over run in time is caused due to several factors. This paper has investigated significant factors which cause time overrun run in Malaysian construction projects. For this investigation, data was carried out through survey among the contractors registered under top two categories of G6 and G7 with Construction Industry Development Board (CIDB). Average index calculation of the gathered data showed that frequent design changes, change in the scope of the project, financial difficulties of owner, delays in decisions making and unforeseen ground condition are major factors of time overrun. These factors are owner related issue, hence for improving time performance owners are required to adopt effective contract management

[1]  Ismail Abdul Rahman,et al.  Preliminary Study on Causative Factors Leading to Construction Cost Overrun , 2011 .

[2]  Mohan M. Kumaraswamy,et al.  An evaluation of construction time performance in the building industry , 1996 .

[3]  Ayman Abu Hammad,et al.  Delays in construction projects: The case of Jordan , 2008 .

[4]  Geraldine J. Kikwasi,et al.  Causes and Effects of Delays and Disruptions in Construction Projects in Tanzania , 2013 .

[5]  H. Danso,et al.  Evaluation of the Factors Influencing Time and Cost Overruns in Telecom Tower Construction in Ghana , 2012 .

[6]  Ming Sun,et al.  Cost and time control of construction projects: inhibiting factors and mitigating measures in practice , 2010 .

[7]  Anil Sawhney,et al.  Analysing factors affecting delays in Indian construction projects , 2012 .

[8]  Ismail Abdul Rahman,et al.  Time Overrun in Construction Projects from the Perspective of Project Management Consultant (PMC) , 2011 .

[9]  Siddesh K. Pai,et al.  Analysis of Critical Causes of Delays in Indian Infrastructure Projects , 2013 .

[10]  Norngainy Mohd Tawil,et al.  Cause of construction delay - Theoretical framework , 2011 .

[11]  Frank Fugar,et al.  Delays in Building Construction Projects in Ghana , 2010 .

[12]  Murat Gunduz,et al.  Quantification of Delay Factors Using the Relative Importance Index Method for Construction Projects in Turkey , 2013 .

[13]  M. Abedi,et al.  Major causes of construction delays under client category and contractor category , 2011 .

[14]  Sadi Assaf,et al.  Causes of delay in large construction projects , 2006 .

[15]  Abubakar Danladi Isah,et al.  CAUSES OF DELAY IN NIGERIA CONSTRUCTION INDUSTRY , 2012 .

[16]  Ibrahim Mahamid Common risks affecting time overrun in road construction projects in Palestine: Contractors’ perspective , 2013 .

[17]  Fazil T. Najafi,et al.  Cost and time overruns in highway construction , 2002 .

[18]  P. Labossière,et al.  The Canadian Society for Civil Engineering , 1992 .

[19]  Keith Pickavance,et al.  Delay and Disruption in Construction Contracts , 1997 .

[20]  Mohamed M. Marzouk,et al.  Analyzing delay causes in Egyptian construction projects , 2013, Journal of advanced research.

[21]  Ismail Abdul Rahman,et al.  Time and Cost Performance in Construction Projects in Southern and Central Regions of Peninsular Malaysia , 2012 .

[22]  Matthew H. Roy,et al.  An investigation of the status of the Malaysian construction industry , 2010 .