Quantitative Methods for Design-Build Team Selection

Use of design-build (DB) contracting by transportation agencies has been steadily increasing as a project delivery system for large complex highway projects. However, moving to DB from traditional design-bid-build procurement can be a challenge. One significant barrier is gaining acceptance of a best value selection process in which technical aspects of a proposal are considered separately and then combined with price to determine the winning proposal. These technical aspects mostly consist of qualitative criteria, thus making room for human errors or biases. Any perceived presence of bias or influence in the selection process can lead to public mistrust and protests by bidders. It is important that a rigorous quantitative mathematical analysis of the evaluation process be conducted to determine whether bias exists and to eliminate it. The paper discusses two potential sources of bias – the evaluators and the weighting model – in the DB selection process and presents mathematical models to detect and remove biases should they exist. A score normalization model deals with biases from the evaluators; then a graphical weight space volume model and a Monte Carlo statistical sampling model are developed to remove biases from the weighting model. The models are then tested and demonstrated using results from the DB bridge replacement project for the collapsed Mississippi River bridge of Interstate 35W in Minneapolis, Minnesota.

[1]  Zedan Hatush,et al.  Evaluating contractor prequalification data: selection criteria and project success factors , 1997 .

[2]  Keith R. Molenaar,et al.  MODEL FOR PUBLIC SECTOR DESIGN-BUILD PROJECT SELECTION , 1998 .

[3]  Michael A. Ellicott,et al.  Best-value contracting criteria , 1997 .

[4]  Patrick S. W. Fong,et al.  Final contractor selection using the analytical hierarchy process , 2000 .

[5]  Alan R. Phipps Maine Builds Longest-Span Precast Segmental Bridge with Unique Design-Build Selection Process , 2000 .

[6]  Robert L. K. Tiong,et al.  A Fuzzy Decision Framework for Contractor Selection , 2005 .

[7]  J. Martino Research and Development project selection , 1995 .

[8]  D D Gransberg,et al.  DESIGN-BUILD CONTRACT AWARD METHODS FOR TRANSPORTATION PROJECTS. TECHNICAL NOTE , 1999 .

[9]  Keith R. Molenaar,et al.  Legal Challenge to a Best-Value Procurement System , 2006 .

[10]  Michael C. Loulakis,et al.  Design-Build: Planning Through Development , 2000 .

[11]  Martin Skitmore,et al.  Contractor selection using multi criteria utility theory: an additive mode , 1998 .

[12]  John Messner,et al.  Comparing procurement methods for design-build projects , 2006 .

[13]  Ekambaram Palaneeswaran,et al.  Targeting optimum value in public sector projects through “best value”‐focused contractor selection , 2003 .

[14]  Zohar J. Herbsman,et al.  MULTIPARAMETER BIDDING SYSTEM - INNOVATION IN CONTRACT ADMINISTRATION , 1992 .

[15]  James E. Roberts,et al.  Use of Best Value Selection Process: Utah Department of Transportation I-15 Design-Build Project , 1999 .

[16]  Burton V. Dean,et al.  Scoring and Profitability Models for Evaluating and Selecting Engineering Projects , 1965 .

[17]  Jeffrey S. Russell,et al.  Decision models for analysis and evaluation of construction contractors , 1992 .

[18]  Keith R. Molenaar,et al.  Does Design-Build Project Delivery Affect the Future of the Public Engineer? , 2008 .