Quantitative Methods for Design-Build Team Selection
暂无分享,去创建一个
[1] Zedan Hatush,et al. Evaluating contractor prequalification data: selection criteria and project success factors , 1997 .
[2] Keith R. Molenaar,et al. MODEL FOR PUBLIC SECTOR DESIGN-BUILD PROJECT SELECTION , 1998 .
[3] Michael A. Ellicott,et al. Best-value contracting criteria , 1997 .
[4] Patrick S. W. Fong,et al. Final contractor selection using the analytical hierarchy process , 2000 .
[5] Alan R. Phipps. Maine Builds Longest-Span Precast Segmental Bridge with Unique Design-Build Selection Process , 2000 .
[6] Robert L. K. Tiong,et al. A Fuzzy Decision Framework for Contractor Selection , 2005 .
[7] J. Martino. Research and Development project selection , 1995 .
[8] D D Gransberg,et al. DESIGN-BUILD CONTRACT AWARD METHODS FOR TRANSPORTATION PROJECTS. TECHNICAL NOTE , 1999 .
[9] Keith R. Molenaar,et al. Legal Challenge to a Best-Value Procurement System , 2006 .
[10] Michael C. Loulakis,et al. Design-Build: Planning Through Development , 2000 .
[11] Martin Skitmore,et al. Contractor selection using multi criteria utility theory: an additive mode , 1998 .
[12] John Messner,et al. Comparing procurement methods for design-build projects , 2006 .
[13] Ekambaram Palaneeswaran,et al. Targeting optimum value in public sector projects through “best value”‐focused contractor selection , 2003 .
[14] Zohar J. Herbsman,et al. MULTIPARAMETER BIDDING SYSTEM - INNOVATION IN CONTRACT ADMINISTRATION , 1992 .
[15] James E. Roberts,et al. Use of Best Value Selection Process: Utah Department of Transportation I-15 Design-Build Project , 1999 .
[16] Burton V. Dean,et al. Scoring and Profitability Models for Evaluating and Selecting Engineering Projects , 1965 .
[17] Jeffrey S. Russell,et al. Decision models for analysis and evaluation of construction contractors , 1992 .
[18] Keith R. Molenaar,et al. Does Design-Build Project Delivery Affect the Future of the Public Engineer? , 2008 .