Early-stage firms and delay-based inventory control using decision-making tableaux

A resource constrained early-stage firm commercialising assembled products faces supply chain (SC) problems that could ultimately cause the company to fail. Delays, complexity, and associated cost overruns throughout the SC can quickly drain cash flow, putting a new firm in a disadvantaged position. This is exacerbated by the increased use of outsourced global suppliers, demands of resellers, and pressure for rapid growth. A decision-making tableau over a conceptual delay-based SC model is proposed, which identifies qualitative behaviour of inventories with respect to delays inherently present in the SC. The method can foster improved strategic decisions in new venture SC set-up and management that can reduce costly variations. A real-world case scenario is given illustrating a current state and substantially improved future state with the help of the proposed approach. The paper concludes with a discussion on the results, limitations, and direction of future research.

[1]  Richard J. Arend,et al.  Small business and supply chain management: is there a fit? , 2005 .

[2]  B. Beamon Supply chain design and analysis:: Models and methods , 1998 .

[3]  Denis Royston Towill,et al.  Dynamic analysis of an inventory and order based production control system , 1982 .

[4]  Hean Tat Keh,et al.  The effects of entrepreneurial orientation and marketing information on the performance of SMEs , 2007 .

[5]  Matti Tuominen,et al.  Entrepreneurial innovations, market-driven intangibles and learning orientation: critical indicators for performance advantages in SMEs , 2006 .

[6]  Vineet Padmanabhan,et al.  Comments on "Information Distortion in a Supply Chain: The Bullwhip Effect" , 1997, Manag. Sci..

[7]  C. McHorney,et al.  An ethnographic study of the meaning of continuity of care in mental health services. , 1999, Psychiatric services.

[8]  Mohamed Mohamed Naim,et al.  Dynamic analysis of a WIP compensated decision support system , 1994 .

[9]  J. Forrester Industrial Dynamics , 1997 .

[10]  Dirk Helbing,et al.  On Stability Analysis and Parametric Design of Supply Networks Under the Presence of Transportation Delays , 2006 .

[11]  Carlos F. Daganzo,et al.  A theory of supply chains , 2003 .

[12]  Roger D. H. Warburton,et al.  An exact analytical solution to the production inventory control problem , 2004 .

[13]  S. Bennett,et al.  Quantifying bounded rationality: Managerial behaviour and the Smith predictor , 2003, Int. J. Syst. Sci..

[14]  Carlos F. Daganzo,et al.  On the Stability of Supply Chains , 2002, Oper. Res..

[15]  Felix T.S. Chan,et al.  Framework for flexibility in dynamic supply chain management , 2008 .

[16]  Fangruo Chen Decentralized supply chains subject to information delays , 1999 .

[17]  David F. Pyke,et al.  Exploiting timely demand information to reduce inventories , 1996 .

[18]  Paul R. Milgrom,et al.  Economics, Organization and Management , 1992 .

[19]  J. Lynn Johnson,et al.  The Small Business Owner-Manager's Search for External Information , 1987 .

[20]  M. Iansiti Shooting the Rapids: Managing Product Development in Turbulent Environments , 1995 .

[21]  S. Disney,et al.  On the equivalence of control theoretic, differential, and difference equation approaches to modeling supply chains , 2006 .

[22]  William B. Gartner,et al.  Predicting new venture survival: An analysis of “anatomy of a start-up.” cases from Inc. Magazine , 1999 .

[23]  K. London,et al.  An industrial organization economic supply chain approach for the construction industry: a review , 2001 .

[24]  O. Williamson Transaction-Cost Economics: The Governance of Contractual Relations , 1979, The Journal of Law and Economics.

[25]  Fukunari Kimura,et al.  Subcontracting and the Performance of Small and Medium Firms in Japan , 2002 .

[26]  D. Sterman,et al.  Misperceptions of Feedback in a Dynamic Decision Making Experiment , 1989 .

[27]  Steven Eppinger,et al.  The new practice of global product development , 2007, IEEE Engineering Management Review.

[28]  Nicoleta S. Tipi,et al.  Modelling the dynamics of supply chains , 2000, Int. J. Syst. Sci..

[29]  Keah Choon Tan,et al.  A Structural Equation Model of New Product Design and Development , 2001, Decis. Sci..

[30]  M. Lambrecht,et al.  Transfer function analysis of forecasting induced bullwhip in supply chains , 2002 .

[31]  D. Sculli,et al.  An outsourcing decision model for sustaining long-term performance , 2005 .

[32]  J Swanson,et al.  Business Dynamics—Systems Thinking and Modeling for a Complex World , 2002, J. Oper. Res. Soc..

[33]  O. Williamson,et al.  Markets and Hierarchies: Analysis and Antitrust Implications. , 1977 .

[34]  Tasadduq A. Shervani,et al.  Marketing, Business Processes, and Shareholder Value: An Organizationally Embedded View of Marketing Activities and the Discipline of Marketing , 1999 .

[35]  Brian Headd Redefining Business Success: Distinguishing Between Closure and Failure , 2003 .

[36]  A. G. Fairbairn,et al.  A systems approach to ventures , 1995 .

[37]  F. Piller,et al.  Reducing the risks of new product development , 2006 .

[38]  A. Gunasekaran,et al.  A framework for supply chain performance measurement , 2004 .

[39]  H. Simon,et al.  On the Application of Servomechanism Theory in the Study of Production Control , 1952 .

[40]  S. Niculescu Delay Effects on Stability: A Robust Control Approach , 2001 .

[41]  Peter Kemper,et al.  Supply chain modelling and its analytical evaluation , 2002, J. Oper. Res. Soc..

[42]  Ksenia Podoynitsyna,et al.  Success Factors in New Ventures: A Meta-analysis , 2007 .

[43]  D. Helbing,et al.  Stability analysis and stabilization strategies for linear supply chains , 2003, cond-mat/0304476.

[44]  Khalid Hafeez,et al.  Systems design of a two-echelon steel industry supply chain , 1996 .

[45]  P. Koegel,et al.  Through a different lens: An anthropological perspective on the homeless mentally ill , 1992, Culture, medicine and psychiatry.

[46]  Christos D. Tarantilis,et al.  Dynamic modeling and control of supply chain systems: A review , 2008, Comput. Oper. Res..

[47]  C. Moorman Organizational Market Information Processes: Cultural Antecedents and New Product Outcomes , 1995 .

[48]  Hema A. Krishnan,et al.  Supplier Selection Practices among Small Firms in the United States: Testing Three Models , 2001 .

[49]  Stephen Michael Disney,et al.  Order and inventory variance amplification: The equivalence of discrete and continuous time analyses , 2007 .

[50]  K. Eisenhardt,et al.  Speeding Products to Market: Waiting Time to First Product Introduction in New Firms. , 1990 .