Modeling and scheduling for semiconductor wafer fabrication systems
暂无分享,去创建一个
[1] Li-Chen Fu,et al. Colored timed Petri-net and GA based approach to modeling and scheduling for wafer probe center , 2003, 2003 IEEE International Conference on Robotics and Automation (Cat. No.03CH37422).
[2] Li-Chen Fu,et al. Petri-net and GA based approach to modeling, scheduling, and performance evaluation for wafer fabrication , 2000, Proceedings 2000 ICRA. Millennium Conference. IEEE International Conference on Robotics and Automation. Symposia Proceedings (Cat. No.00CH37065).
[3] Thomas Stützle,et al. An Ant Approach to the Flow Shop Problem , 1998 .
[4] Li-Chen Fu,et al. Modeling, scheduling, and prediction in wafer fabrication systems using queueing Petri net and genetic algorithm , 2001, Proceedings 2001 ICRA. IEEE International Conference on Robotics and Automation (Cat. No.01CH37164).
[5] Tadao Murata,et al. Petri nets: Properties, analysis and applications , 1989, Proc. IEEE.
[6] Vittorio Maniezzo,et al. The Ant System Applied to the Quadratic Assignment Problem , 1999, IEEE Trans. Knowl. Data Eng..
[7] Nicolas Monmarché,et al. An Ant Colony Optimization algorithm to solve a 2-machine bicriteria flowshop scheduling problem , 2002, Eur. J. Oper. Res..
[8] Chandrasekharan Rajendran,et al. Ant-colony algorithms for permutation flowshop scheduling to minimize makespan/total flowtime of jobs , 2004, Eur. J. Oper. Res..
[9] Li-Chen Fu,et al. Petri-net and GA-based approach to modeling, scheduling, and performance evaluation for wafer fabrication , 2000, IEEE Trans. Robotics Autom..