Exploring Different Alert Limit Strategies in the Maintenance of Railway Track Geometry
暂无分享,去创建一个
[1] Hakan Guler,et al. Prediction of railway track geometry deterioration using artificial neural networks: a case study for Turkish state railways , 2014 .
[2] Jianmin Zhao,et al. Optimizing Policies of Railway Ballast Tamping and Renewal , 2006 .
[3] Yung-Cheng Lai,et al. Comprehensive Decision Support Framework for Strategic Railway Capacity Planning , 2011 .
[4] P. Fonseca Teixeira,et al. Biobjective Optimization Model for Maintenance and Renewal Decisions Related to Rail Track Geometry , 2011 .
[5] Rui Calçada,et al. Integer Programming to Optimize Tamping in Railway Tracks as Preventive Maintenance , 2012 .
[6] Hakan Guler,et al. Decision Support System for Railway Track Maintenance and Renewal Management , 2013 .
[7] António Ramos Andrade,et al. Hierarchical Bayesian modelling of rail track geometry degradation , 2013 .
[8] António Ramos Andrade,et al. Statistical modelling of railway track geometry degradation using Hierarchical Bayesian models , 2015, Reliab. Eng. Syst. Saf..
[9] Paulo Fonseca Teixeira,et al. Optimisation model to schedule railway track renewal operations: a life-cycle cost approach , 2015 .
[10] Rui Santos,et al. Heuristic Analysis of the Effective Range of a Track Tamping Machine , 2012 .
[11] Alireza Ahmadi,et al. A Survey on Track Geometry Degradation Modelling , 2016 .
[12] Tomas Lidén. Railway Infrastructure Maintenance - A Survey of Planning Problems and Conducted Research , 2015 .
[13] António Pais Antunes,et al. Planning and scheduling efficient heavy rail track maintenance through a Decision Rules Model , 2015 .
[14] Dennis Huisman,et al. Scheduling preventive railway maintenance activities , 2004, 2004 IEEE International Conference on Systems, Man and Cybernetics (IEEE Cat. No.04CH37583).
[15] Luis Ferreira,et al. Rail Track Maintenance Planning: An Assessment Model , 2000 .
[16] Uday Kumar,et al. Optimisation of maintenance track possession time: A tamping case study , 2015 .
[17] António Ramos Andrade,et al. Predicting Unplanned Maintenance Needs Related to Rail Track Geometry , 2014 .
[18] Rommert Dekker,et al. Genetic and memetic algorithms for scheduling railway maintenance activities , 2009 .
[19] Paulo Fonseca Teixeira,et al. Availability Approach to Optimizing Railway Track Renewal Operations , 2013 .
[20] Yanfeng Ouyang,et al. A Heuristic Approach to the Railroad Track Maintenance Scheduling Problem , 2011, Comput. Aided Civ. Infrastructure Eng..