Exploring Different Alert Limit Strategies in the Maintenance of Railway Track Geometry

AbstractThis paper explores a quantitative model with different maintenance strategies to control railway track geometry degradation in Portugal. The alert limits put forward by the international standards are assessed regarding the planned and unplanned impacts associated with those limits, namely preventive maintenance and renewal costs, corrective maintenance costs, planned infrastructure delays due to changes in the maximum permissible speed, and unplanned infrastructure delays due to temporary speed restrictions. The effects of different choices for the alert limits of the main quality indicators for railway track geometry are assessed, considering a cost penalty due to delays set by the regulatory entity. Finally, a sensitivity analysis is conducted on the effect of this delay cost penalty on the optimized choice of the alert limits for both quality indicators.

[1]  Hakan Guler,et al.  Prediction of railway track geometry deterioration using artificial neural networks: a case study for Turkish state railways , 2014 .

[2]  Jianmin Zhao,et al.  Optimizing Policies of Railway Ballast Tamping and Renewal , 2006 .

[3]  Yung-Cheng Lai,et al.  Comprehensive Decision Support Framework for Strategic Railway Capacity Planning , 2011 .

[4]  P. Fonseca Teixeira,et al.  Biobjective Optimization Model for Maintenance and Renewal Decisions Related to Rail Track Geometry , 2011 .

[5]  Rui Calçada,et al.  Integer Programming to Optimize Tamping in Railway Tracks as Preventive Maintenance , 2012 .

[6]  Hakan Guler,et al.  Decision Support System for Railway Track Maintenance and Renewal Management , 2013 .

[7]  António Ramos Andrade,et al.  Hierarchical Bayesian modelling of rail track geometry degradation , 2013 .

[8]  António Ramos Andrade,et al.  Statistical modelling of railway track geometry degradation using Hierarchical Bayesian models , 2015, Reliab. Eng. Syst. Saf..

[9]  Paulo Fonseca Teixeira,et al.  Optimisation model to schedule railway track renewal operations: a life-cycle cost approach , 2015 .

[10]  Rui Santos,et al.  Heuristic Analysis of the Effective Range of a Track Tamping Machine , 2012 .

[11]  Alireza Ahmadi,et al.  A Survey on Track Geometry Degradation Modelling , 2016 .

[12]  Tomas Lidén Railway Infrastructure Maintenance - A Survey of Planning Problems and Conducted Research , 2015 .

[13]  António Pais Antunes,et al.  Planning and scheduling efficient heavy rail track maintenance through a Decision Rules Model , 2015 .

[14]  Dennis Huisman,et al.  Scheduling preventive railway maintenance activities , 2004, 2004 IEEE International Conference on Systems, Man and Cybernetics (IEEE Cat. No.04CH37583).

[15]  Luis Ferreira,et al.  Rail Track Maintenance Planning: An Assessment Model , 2000 .

[16]  Uday Kumar,et al.  Optimisation of maintenance track possession time: A tamping case study , 2015 .

[17]  António Ramos Andrade,et al.  Predicting Unplanned Maintenance Needs Related to Rail Track Geometry , 2014 .

[18]  Rommert Dekker,et al.  Genetic and memetic algorithms for scheduling railway maintenance activities , 2009 .

[19]  Paulo Fonseca Teixeira,et al.  Availability Approach to Optimizing Railway Track Renewal Operations , 2013 .

[20]  Yanfeng Ouyang,et al.  A Heuristic Approach to the Railroad Track Maintenance Scheduling Problem , 2011, Comput. Aided Civ. Infrastructure Eng..