A Problem-Specific and Effective Metaheuristic for Flexibility Design
暂无分享,去创建一个
[1] Miao-Sheng Chen,et al. Effects of Centralization on Expected Costs in a Multi-location Newsboy Problem , 1989 .
[2] Sigrún Andradóttir,et al. Compensating for Failures with Flexible Servers , 2007, Oper. Res..
[3] William C. Jordan,et al. Principles on the benefits of manufacturing process flexibility , 1995 .
[4] Achim Koberstein,et al. Modeling and optimizing of strategic and tactical production planning in the automotive industry under uncertainty , 2009, OR Spectr..
[5] John H. Holland,et al. Adaptation in Natural and Artificial Systems: An Introductory Analysis with Applications to Biology, Control, and Artificial Intelligence , 1992 .
[6] Ward Whitt,et al. A Staffing Algorithm for Call Centers with Skill-Based Routing , 2005, Manuf. Serv. Oper. Manag..
[7] Marc Goetschalckx,et al. A stochastic programming approach for supply chain network design under uncertainty , 2004, Eur. J. Oper. Res..
[8] Robert A. Shumsky,et al. Routing and Staffing in Large Call Centers with Specialized and Fully Flexible Servers , 2004 .
[9] A. Srinivasan. Approximation algorithms via randomized rounding : a survey , 1999 .
[10] Goldberg,et al. Genetic algorithms , 1993, Robust Control Systems with Genetic Algorithms.
[11] Charles H. Fine,et al. Optimal investment in product-flexible manufacturing capacity , 1990 .
[12] Manoj K. Malhotra,et al. A theoretical framework for analyzing the dimensions of manufacturing flexibility , 1999 .
[13] Seyed M. R. Iravani,et al. Structural Flexibility: A New Perspective on the Design of Manufacturing and Service Operations , 2005, Manag. Sci..
[14] Fikri Karaesmen,et al. Characterizing the performance of process flexibility structures , 2007, Oper. Res. Lett..
[15] Herbert Meyr,et al. Strategic network planning for an international automotive manufacturer , 2009, OR Spectr..
[16] Jwm Will Bertrand,et al. Supply Chain Design: Flexibility Considerations , 2003, Supply Chain Management.
[17] Bernhard Fleischmann,et al. Strategic Planning of BMW's Global Production Network , 2006, Interfaces.
[18] David E. Goldberg,et al. Genetic Algorithms in Search Optimization and Machine Learning , 1988 .
[19] Wallace J. Hopp,et al. Benefits of Skill Chaining in Serial Production Lines with Cross-Trained Workers , 2004, Manag. Sci..
[20] Michael Pidd,et al. Computer Simulation in Management Science (3rd Edition) , 1998 .
[21] Saif Benjaafar,et al. Modeling and analysis of flexible queueing systems , 2004 .
[22] Michael J. Brusco,et al. Staffing a Multiskilled Workforce with Varying Levels of Productivity: An Analysis of Cross‐training Policies* , 1998 .
[23] David S. Johnson,et al. Computers and Intractability: A Guide to the Theory of NP-Completeness , 1978 .
[24] G. D. Eppen. Note---Effects of Centralization on Expected Costs in a Multi-Location Newsboy Problem , 1979 .
[25] Chung-Piaw Teo,et al. Design for Process Flexibility: Efficiency of the Long Chain and Sparse Structure , 2010, Oper. Res..
[26] J. V. Mieghem. Investment Strategies for Flexible Resources , 1998 .
[27] Gloria Pérez,et al. An Approach for Strategic Supply Chain Planning under Uncertainty based on Stochastic 0-1 Programming , 2003, J. Glob. Optim..
[28] Wallace J. Hopp,et al. Agile workforce evaluation: a framework for cross-training and coordination , 2004 .