Guidelines for Enhancing Power Plant Response to Partial Load Rejections
暂无分享,去创建一个
[1] H. Termuehlen,et al. Sustained Fast Turbine-Generator Load Response in Fossil-Fueled Power Plants , 1981, IEEE Transactions on Power Apparatus and Systems.
[2] Robert H. Hillery,et al. Load Rejection Testing of Large Thermal-Electric Generating Units , 1968 .
[3] M. Baldwin,et al. Power Systems Performance as Affected by Turbine-Generator Controls Response During Frequency Disturbances , 1981, IEEE Transactions on Power Apparatus and Systems.
[4] A. H. Rawdon,et al. Effects of Partial Load Rejection on Fossil Fuel Utility Steam Generators , 1982, IEEE Transactions on Power Apparatus and Systems.
[5] R. Dunlop,et al. Discriminating Acceleration Limiting Devices for Turbine Generators , 1980, IEEE Transactions on Power Apparatus and Systems.
[6] G.P. Schatzmann. Turbine Overspeed Control Behaviour , 1981, IEEE Transactions on Power Apparatus and Systems.
[7] F. De Mello,et al. Efficiencies of Thermal Plants During Transient Duty , 1981, IEEE Transactions on Power Apparatus and Systems.
[8] F. H. Fenton. Survey of Cyclic Load Capabilities of Fossil-Steam Generating Units , 1982, IEEE Power Engineering Review.
[9] O. Durrant. Boiler Response to Partial Load Rejections Resulting From System Upsets , 1982, IEEE Transactions on Power Apparatus and Systems.
[10] P. Kundur. A Survey of Utility Experience with Power Plant Response During Partial Load Rejection and System Disturbances , 1981, IEEE Transactions on Power Apparatus and Systems.
[11] T.D. Younkins,et al. Steam Turbine Overspeed Control and Behavior During System Disturbances , 1981, IEEE Transactions on Power Apparatus and Systems.