Construction method for bridge steel box basket arch
暂无分享,去创建一个
The steel box and basket arch bridge constructing process with 500-ton crane boat and full framing includes the following steps: determining the structural shape, rise-to-span ratio, arch rib toe-in angle and arch rib section form; installing the steel box girder support and midspan steel box girder; hoisting side arch and sidespan steel box girder and finally hoisting arch center. During the process, a total station meter and water level gages are adopted for overall process measurement, and jacks in longitudinal, transverse and vertical directions are utilized to locate the arch ribs and the steel box girder precisely, so as to ensure correct structural form and construction safety. At the same time, ANSYS program for calculating the installation profile and sensors for structure and stress control are also utilized. The constructing process is simple and easy to control, and the steel box and basket arch bridge has high typhoon resistance and high efficiency.