Possibilistic Programming and Gas for Aggregate Production Planning under Vague Information
暂无分享,去创建一个
Sergio Fichera | Giovanni Perrone | V. Grasso | U. La Commare | A. La Spada | U. Commare | G. Perrone | A. Spada | S. Fichera | V. Grasso
[1] E. Lee,et al. Analysis and simulation of fuzzy queues , 1992 .
[2] E.Stanley Lee,et al. Fuzzy job sequencing for a flow shop , 1992 .
[3] Masahiro Inuiguchi,et al. The usefulness of possibilistic programming in production planning problems , 1994 .
[4] H. Ishibuchi,et al. Formulation of fuzzy flowshop scheduling problems with fuzzy processing time , 1996, Proceedings of IEEE 5th International Fuzzy Systems.
[5] Zbigniew Michalewicz,et al. Genetic Algorithms + Data Structures = Evolution Programs , 1996, Springer Berlin Heidelberg.
[6] Tzung-Pei Hong,et al. A fuzzy LPT algorithm for scheduling , 1995, 1995 IEEE International Conference on Systems, Man and Cybernetics. Intelligent Systems for the 21st Century.
[7] S. Noto La Diega,et al. A Fuzzy Discrete Event Simulator for Fuzzy Production Environment Analysis , 1998 .
[8] H. Ishibuchi,et al. Local search algorithms for flow shop scheduling with fuzzy due-dates☆ , 1994 .
[9] M. Kuroda,et al. Fuzzy Job Shop Scheduling , 1996 .
[10] Hiroaki Ishii,et al. Two scheduling problems with fuzzy due-dates , 1992 .