Optimal batch sizing in a multi-stage production system with rework consideration

In a production system, rework process plays an important role in eliminating waste and effectively controlling the cost of manufacturing. Determining the optimal batch size in a system that allows for rework is, therefore, a worthwhile objective to minimize the inventory cost of work-in-processes and the finished goods. In this paper, models for the optimum batch quantity in a multi-stage system with rework process have been developed for two different operational policies. Policy 1 deals with the rework within the same cycle with no shortage and policy 2 deals with the rework done after N cycles, incurring shortages in each cycle. The major components that play a role in minimizing this cost of the system are manufacturing setups, work-in-processes, storage of finished goods, rework processing, waiting-time, and penalty costs to discourage the generation of defectives. The mathematical structure of this rework processing model falls under a nonlinear convex programming problems for which a closed-form solution has been proposed and results are demonstrated through numerical examples, followed by sensitivity analyses of different important parameters. It is concluded that the total cost in policy 2 tends to be smaller than that in policy 1 at lower proportion of defectives if the in-process carrying cost is low. Policy 2 may be preferred when the work-in-process carrying cost is low and the penalty cost is negligible.

[1]  Sung-Hoon Hong,et al.  Economic design of screening procedures when the rejected items are reprocessed , 1998, Eur. J. Oper. Res..

[2]  Evan L. Porteus Investing in Reduced Setups in the EOQ Model , 1985 .

[3]  S. H. Cheraghi,et al.  Fuzzy defect avoidance system (FDAS) for product defect control , 2004 .

[4]  Maurice Bonney,et al.  Lot sizing with learning and forgetting in set-ups and in product quality , 2003 .

[5]  S. Goyal Economic batch quantity in a multi-stage production system , 1978 .

[6]  Evan L. Porteus Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction , 1986, Oper. Res..

[7]  Bhaba R. Sarker,et al.  Manufacturing setup cost reduction under variable lead times and finite opportunities for investment , 1997 .

[8]  A. Seidmann,et al.  Production lot sizing with machine breakdowns , 1992 .

[9]  Christopher S. Tang,et al.  Optimal operating policy for a bottleneck with random rework , 1995 .

[10]  Karl Inderfurth,et al.  Planning and control of rework in the process industries: A review , 2002 .

[11]  M. K. Salameh,et al.  Economic production quantity model for items with imperfect quality , 2000 .

[12]  Tarun Gupta,et al.  Looping in a multistage production system , 1984 .

[13]  Simme Douwe P. Flapper,et al.  Logistic planning of rework with deteriorating work-in-process , 2004 .

[14]  Meir J. Rosenblatt,et al.  Economic Production Cycles with Imperfect Production Processes , 1986 .

[15]  Upendra Kumar,et al.  Optimization of Single-Item Multi-Stage Stochastic Production — Inventory Systems , 1979 .

[16]  Ron S. Kenett,et al.  The impact of defects on a process with rework , 1995 .

[17]  Layek Abdel-Malek,et al.  An analytical approach to process planning with rework option , 1996 .

[18]  Angappa Gunasekaran,et al.  Effect of Dynamic Process Quality Control on the Economics of Production , 1990 .

[19]  M. Chandra,et al.  OPTIMAL BATCH SIZE AND INVESTMENT IN MULTISTAGE PRODUCTION SYSTEMS WITH SCRAP , 1997 .

[20]  Hau L. Lee,et al.  Lot sizing to reduce capacity utilization in a production process with defective items, process corrections, and rework , 1992 .

[21]  Charles S. Tapiero Continuous quality production and machine maintenance , 1986 .

[22]  Anne Spence Wein,et al.  Random Yield, Rework and Scrap in a Multistage Batch Manufacturing Environment , 1992, Oper. Res..

[23]  Bhaba R. Sarker,et al.  Optimal production plans and shipment schedules in a supply-chain system with multiple suppliers and multiple buyers , 2009, Eur. J. Oper. Res..

[24]  C. H. Kim,et al.  An optimal production run length in deteriorating production processes , 1999 .

[25]  Ruud H. Teunter,et al.  Lot-sizing for a single-stage single-product production system with rework of perishable production defectives , 2003, OR Spectr..

[26]  Giri Kumar Tayi,et al.  An integrated production-inventory model with reprocessing and inspection , 1988 .

[27]  Yannick Frein,et al.  Performance evaluation and design of a CONWIP system with inspections , 2000 .