A continuous model for open pit mine planning
暂无分享,去创建一个
Andreas Griewank | Jorge Amaya | Felipe Alvarez | Nikolai Strogies | A. Griewank | F. Alvarez | N. Strogies | J. Amaya
[1] Dorit S. Hochbaum,et al. Performance Analysis and Best Implementations of Old and New Algorithms for the Open-Pit Mining Problem , 2000, Oper. Res..
[2] G. M.,et al. Partial Differential Equations I , 2023, Applied Mathematical Sciences.
[3] W. Hustrulid,et al. Open Pit Mine Planning and Design , 2015 .
[4] L. M. Giannini. Optimum design of open pit mines , 1991, Bulletin of the Australian Mathematical Society.
[5] D. Preiss,et al. Directional derivatives of Lipschitz functions , 2001 .
[6] Lou Caccetta,et al. An Application of Branch and Cut to Open Pit Mine Scheduling , 2003, J. Glob. Optim..
[7] Donald M. Topkis,et al. Minimizing a Submodular Function on a Lattice , 1978, Oper. Res..
[8] Louis Caccetta,et al. Application of Optimisation Techniques in Open Pit Mining , 2007 .
[9] Alan T. Murray,et al. HANDBOOK OF OPERATIONS RESEARCH IN NATURAL RESOURCES , 2007 .