Modification of the dynamic scale of marks in analytic hierarchy process (ahp) and analytic network approach (anp) through application of fuzzy approach

There are two mainstreams in the use of the analytic network process (ANP) and analytic hierarchy process (AHP). One is the standard applications of crisp distributive and ideal mode versions. The other is characterised by fuzzification of the AHP/ANP methodology and by attempts to tackle better inherently uncertain and imprecise decision processes with quantitative and qualitative data. This paper presents modification of the AHP/ANP method, in which fuzzy numbers have been used for determining weight values of criteria and alternatives.Unlike the papers describing the procedure of fuzzification of the AHP/ANP method, the method described here takes into account the level of uncertainty of the decision maker. After application of the AHP/ANP method in this way, the values of the functions criteria for each considered alternative are obtained. Certain values of the level of certainty are corresponding to the obtained values of the functions criteria. It is possible to generate various sets of the values of criterion functions. Since large number of experts often participate in decision making, the model deals with possibility of synthesis of the optimality of criterion values in case of group decision making. The proposed methodology has been used for the assessment of management plans in West Serbia.

[1]  James L. Corner,et al.  Decision Analysis Applications in the Operations Research Literature, 1970-1989 , 1991, Oper. Res..

[2]  Paul R. Kleindorfer,et al.  Integrating manufacturing strategy and technology choice , 1990 .

[3]  R. Shankar,et al.  On‐line trust building in e‐enabled supply chain , 2003 .

[4]  Thomas L. Saaty,et al.  Multicriteria Decision Making: The Analytic Hierarchy Process: Planning, Priority Setting, Resource Allocation , 1990 .

[5]  Ravi Shankar,et al.  Selection of logistics service provider: An analytic network process (ANP) approach , 2007 .

[6]  H.L. Lee,et al.  Aligning Supply Chain Strategies with Product Uncertainties , 2002, IEEE Engineering Management Review.

[7]  Joseph Sarkis,et al.  Justifying strategic alliances and partnering: a prerequisite for virtual enterprising , 1997 .

[8]  M. Kwiesielewicz,et al.  A note on the fuzzy extension of Saaty's priority theory , 1998, Fuzzy Sets Syst..

[9]  Lawrence M. Seiford,et al.  Data envelopment analysis: The evolution of the state of the art (1978–1995) , 1996 .

[10]  T. Saaty Fundamentals of Decision Making and Priority Theory With the Analytic Hierarchy Process , 2000 .

[11]  Thomas L. Saaty,et al.  DECISION MAKING WITH THE ANALYTIC HIERARCHY PROCESS , 2008 .

[12]  Hepu Deng Multicriteria analysis with fuzzy pairwise comparison , 1999, FUZZ-IEEE'99. 1999 IEEE International Fuzzy Systems. Conference Proceedings (Cat. No.99CH36315).

[13]  Cevriye Gencer,et al.  Analytic network process in supplier selection: A case study in an electronic firm , 2007 .

[14]  G. A. Miller THE PSYCHOLOGICAL REVIEW THE MAGICAL NUMBER SEVEN, PLUS OR MINUS TWO: SOME LIMITS ON OUR CAPACITY FOR PROCESSING INFORMATION 1 , 1956 .

[15]  F. A. Lootsma,et al.  Multicriteria decision analysis with fuzzy pairwise comparisons , 1989 .

[16]  Heng Li,et al.  Analytic network process applied to project selection , 2005 .

[17]  Chun-Chu Liu,et al.  A study for allocating resources to research and development programs by integrated fuzzy DEA and fuzzy AHP , 2011 .

[18]  Joseph Sarkis,et al.  Hub location at Digital Equipment Corporation: A comprehensive analysis of qualitative and quantitative factors , 2002, Eur. J. Oper. Res..

[19]  Jung P. Shim,et al.  Bibliographical research on the Analytic Hierarchy Process (AHP) , 1989 .

[20]  Donald A. Keefer,et al.  Decision Analysis Applications in the Operations Research Literature , 1990 .

[21]  Michael Wagenknecht,et al.  On fuzzy rank-ordering in polyoptimization , 1983 .

[22]  Bruce L. Golden,et al.  Celebrating 25 years of AHP-based decision making , 2003, Comput. Oper. Res..

[23]  Metin Dağdeviren,et al.  Personnel selection using analytic network process , 2007 .

[24]  Ching-Lai Hwang,et al.  Fuzzy Multiple Attribute Decision Making - Methods and Applications , 1992, Lecture Notes in Economics and Mathematical Systems.

[25]  Mustafa Yurdakul,et al.  Measuring long-term performance of a manufacturing firm using the Analytic Network Process (ANP) approach , 2003 .

[26]  F. A. Lootsma,et al.  Numerical scaling of human judgement in pairwise-comparison methods for fuzzy multi-criteria decision analysis , 1988 .

[27]  F. Lootsma The french and the american school in multi-criteria decision analysis , 1990 .

[28]  Wann-Ming Wey,et al.  Using ANP priorities with goal programming for revitalization strategies in historic transport: A case study of the Alishan Forest Railway , 2009, Expert Syst. Appl..

[29]  Evangelos Triantaphyllou,et al.  Development and evaluation of five fuzzy multiattribute decision-making methods , 1996, Int. J. Approx. Reason..

[30]  Fatemeh Zahedi,et al.  The Analytic Hierarchy Process—A Survey of the Method and its Applications , 1986 .

[31]  Ashish Agarwal,et al.  Analyzing alternatives for improvement in supply chain performance , 2002 .

[32]  Mao-Jiun J. Wang,et al.  Ranking fuzzy numbers with integral value , 1992 .

[33]  Adrien Presley,et al.  R&D project selection using the analytic network process , 2002, IEEE Trans. Engineering Management.

[34]  Piero Risoluti Fuzzy Sets, Decision Making, and Expert Systems , 2004 .

[35]  W. Pedrycz,et al.  A fuzzy extension of Saaty's priority theory , 1983 .

[36]  Ruoning Xu,et al.  Fuzzy least-squares priority method in the analytic hierarchy process , 2000, Fuzzy Sets Syst..

[37]  Soung Hie Kim,et al.  Using analytic network process and goal programming for interdependent information system project selection , 2000, Comput. Oper. Res..

[38]  Nebojsa J. Bojovic,et al.  Organizational design of a post office using analytic network process , 2010 .

[39]  J. Buckley Ranking alternatives using fuzzy numbers , 1985 .

[40]  Freerk A. Lootsma,et al.  Multi-criteria analysis and budget reallocation in long-term research planning , 1990 .

[41]  Jennifer S. Shang,et al.  A unified framework for multicriteria evaluation of transportation projects , 2004, IEEE Transactions on Engineering Management.

[42]  Joseph Sarkis,et al.  Analyzing organizational project alternatives for agile manufacturing processes: An analytical network approach , 1999 .

[43]  Seyed Hassan Ghodsypour,et al.  A decision support system for supplier selection using an integrated analytic hierarchy process and linear programming , 1998 .

[44]  Thomas L. Saaty,et al.  Decision making with dependence and feedback : the analytic network process : the organization and prioritization of complexity , 1996 .