Study on mitigation of in-vessel release of fission products in severe accidents of PWR

Abstract During the severe accidents in a nuclear power plant, large amounts of fission products release with accident progression, including in-vessel and ex-vessel release. Mitigation of fission products release is demanded for alleviating radiological consequence in severe accidents. Mitigation countermeasures to in-vessel release are studied for Chinese 600 MW pressurized water reactor (PWR), including feed-and-bleed in primary circuit, feed-and-bleed in secondary circuit and ex-vessel cooling. SBO, LOFW, SBLOCA and LBLOCA are selected as typical severe accident sequences. Based on the evaluation of in-vessel release with different startup time of countermeasure, and the coupling relationship between thermohydraulics and in-vessel release of fission products, some results are achieved. Feed-and-bleed in primary circuit is an effective countermeasure to mitigate in-vessel release of fission products, and earlier startup time of countermeasure is more feasible. Feed-and-bleed in secondary circuit is also an effective countermeasure to mitigate in-vessel release for most severe accident sequences that can cease core melt progression, e.g. SBO, LOFW and SBLOCA. Ex-vessel cooling has no mitigation effect on in-vessel release owing to inevitable core melt and relocation.