Australian multi‐unit residential project construction time performance factors
暂无分享,去创建一个
[1] S. Jayes,et al. TRUSTING THE TEAM , 1995 .
[2] Mohan M. Kumaraswamy,et al. A study of the factors affecting construction durations in Hong Kong , 1995 .
[3] N. Mansfield,et al. Causes of delay and cost overruns in Nigerian construction projects , 1994 .
[4] Y. Doz,et al. Alliance Advantage: The Art of Creating Value Through Partnering , 1998 .
[5] Wai-ming Chan,et al. Modelling construction durations for public housing projects in Hong Kong , 1998 .
[6] Derek H.T. Walker,et al. Choosing an appropriate research methodology , 1997 .
[7] Erik Larson,et al. Project Partnering: Results of Study of 280 Construction Projects , 1995 .
[8] M. M. Dlakwa,et al. Reasons for overrun in public sector construction projects in Nigeria , 1990 .
[9] Vernon Ireland,et al. The role of managerial actions in the cost, time and quality performance of high-rise commercial building projects , 1985 .
[10] S. Siegel,et al. Nonparametric Statistics for the Behavioral Sciences , 2022, The SAGE Encyclopedia of Research Design.