A comparative study of selected multi-criteria decision-making methodologies for location selection of very large concentrated solar power plants in Nigeria

This work studies the location selection of very large concentrated solar power plants (VLCSPPs) in Nigeria using five Multi-Criteria Decision Making (MCDM) methodologies including: Analytic Hierarchy Process (AHP), Consistency-Driven Pairwise Comparisons (CDPC), Decision Expert for Education (DEXi), Elimination and Choice Translating Reality (ELECTRE) III and IV. A comparative investigation is performed on only one unique model that is structured in four levels. This model has nine basic factors (Direct Normal Irradiance, grid infrastructure, climatic conditions, water availability conditions, natural disaster/hazard conditions, topographical conditions, geological conditions, land use, allocation and availability, war, terror & security conditions) taken from previous factors selection studies. There are 35 alternatives for the VLCSPP locations in Nigeria for the pre-development investment stage and are presented on Google Earth file (GE). The Super Decisions, JConcluder, DEXi and ELECTRE III-IV software are mainly used in this study. The findings show that the AHP and CDPC rankings are very close to each other. On the other hand, the DEXi, ELECTRE III and IV rankings spread very much amongst the methods. Hence, a small procedural rule is defined for the selection of candidate locations for detailed investigations. Several candidates’ VLCSPP locations were found to exist as alternatives, with approximate local central coordinates of 13°38′55.37″N, 13°20′41.41″E and 13°6′58.83″N, 13°26′53.63″E in Nigeria. These should be further investigated in the following investment stages.

[1]  María Teresa Lamata,et al.  Consistency in the Analytic Hierarchy Process: a New Approach , 2006, Int. J. Uncertain. Fuzziness Knowl. Based Syst..

[2]  T. L. Saaty A Scaling Method for Priorities in Hierarchical Structures , 1977 .

[3]  Damien Ernst,et al.  The Global Grid , 2012, ArXiv.

[4]  Salvatore Greco,et al.  An Overview of ELECTRE Methods and their Recent Extensions , 2013 .

[5]  Waldemar W. Koczkodaj,et al.  An Expert System for Construction Tendering Process , 1996 .

[6]  Olayinka S. Ohunakin,et al.  Energy Utilization and Renewable Energy Sources in Nigeria , 2010 .

[7]  Burak Omer Saracoglu An Experimental Fuzzy Expert System Based Application For The Go/No-Go Decisions To The Geospatial Investigation Studies Of The Regions Of The Very Large Concentrated Solar Power Plants In The European Supergrid Concept , 2018 .

[8]  Alessio Ishizaka,et al.  Multi-criteria Decision Analysis: Methods and Software , 2013 .

[9]  R. W. Saaty,et al.  The analytic hierarchy process—what it is and how it is used , 1987 .

[10]  M. J. Ladan,et al.  Unlocking Nigeria's Solar PV and CSP Potentials for Sustainable Electricity Development , 2012 .

[11]  Ravi Shankar,et al.  An STEEP-fuzzy AHP-TOPSIS framework for evaluation and selection of thermal power plant location: A case study from India , 2012 .

[12]  M. Bohanec,et al.  The Analytic Hierarchy Process , 2004 .

[13]  Vladislav Rajkovic,et al.  Multiattribute Decisionmaking Using a Fuzzy Heuristic Approach , 1979, IEEE Transactions on Systems, Man, and Cybernetics.

[14]  Vladimir Batagelj,et al.  Knowledge engineering techniques for utility identification , 1988 .

[15]  Robert LIN,et al.  NOTE ON FUZZY SETS , 2014 .

[16]  Bernard Roy,et al.  Ranking of suburban line extension projects on the Paris metro system by a multicriteria method , 1982 .

[17]  Peter Schlyter,et al.  Less is more: Strategic scale site suitability for concentrated solar thermal power in Western Australia , 2012 .

[18]  Vladislav Rajkovic,et al.  DEX Methodology: Three Decades of Qualitative Multi-Attribute Modeling , 2013, Informatica.

[19]  A. Gastli,et al.  GIS assessment of large CSP plant in Duqum, Oman , 2010 .

[20]  Thomas L. Saaty,et al.  How to Make a Decision: The Analytic Hierarchy Process , 1990 .

[21]  Olumide Ogunmodimu CSP Technology and its Potential Contribution to Electricity Supply in northern Nigeria , 2013 .

[22]  B. Boruff,et al.  Assessing the potential for concentrated solar power development in rural Australia , 2010 .

[23]  Karl H. Wolf,et al.  Exploration and mining geology , 1980 .

[24]  D. Wood Supplier selection for development of petroleum industry facilities, applying multi-criteria decision making techniques including fuzzy and intuitionistic fuzzy TOPSIS with flexible entropy weighting , 2016 .

[25]  R. Nosofsky,et al.  Seven plus or minus two: a commentary on capacity limitations. , 1994, Psychological review.

[26]  G. A. Miller THE PSYCHOLOGICAL REVIEW THE MAGICAL NUMBER SEVEN, PLUS OR MINUS TWO: SOME LIMITS ON OUR CAPACITY FOR PROCESSING INFORMATION 1 , 1956 .

[27]  Waldemar W. Koczkodaj,et al.  Mineral-potential assessment of consistency-driven pairwise comparisons , 1997 .

[28]  Min Gao,et al.  Decision framework of solar thermal power plant site selection based on linguistic Choquet operator , 2014 .

[29]  Konrad Kulakowski,et al.  On the quality evaluation of scientific entities in Poland supported by consistency-driven pairwise comparisons method , 2014, Scientometrics.

[30]  Juan Miguel Sánchez-Lozano,et al.  Evaluation of suitable locations for the installation of solar thermoelectric power plants , 2015, Comput. Ind. Eng..

[31]  Burak Omer Saracoglu,et al.  Selecting industrial investment locations in master plans of countries , 2013 .

[32]  Thomas L. Saaty,et al.  DECISION MAKING WITH THE ANALYTIC HIERARCHY PROCESS , 2008 .

[33]  B. O. Saracoglu An Experimental Research of Small Hydropower Plant Investments Selection in Turkey by Carrot2, DEXi, DEXiTree , 2015 .

[34]  S. M. Asadzadeh,et al.  A flexible neural network-fuzzy data envelopment analysis approach for location optimization of solar plants with uncertainty and complexity , 2011 .

[35]  Marko Bohanec,et al.  DEX: An Expert System Shell for Decision Support • , 1990 .

[36]  D. Bouyssou,et al.  Comparison of two decision-aid models applied to a nuclear power plant siting example , 1986 .

[37]  Eli P. Fenichel,et al.  Wealth reallocation and sustainability under climate change , 2016 .

[38]  Ahmed Mezrhab,et al.  CSP Sites Suitability Analysis in the Eastern Region of Morocco , 2014 .

[39]  M. Adaramola,et al.  Solar energy applications and development in Nigeria: Drivers and barriers , 2014 .

[40]  Alexander Mitsos,et al.  Site selection for hillside central receiver solar thermal plants , 2011 .

[41]  W. W. Koczkodaj A new definition of consistency of pairwise comparisons , 1993 .

[42]  G. A. Miller The magical number seven plus or minus two: some limits on our capacity for processing information. , 1956, Psychological review.