Algorithms for the car sequencing and the level scheduling problem
暂无分享,去创建一个
[1] S. Sethi,et al. A Note on "Level Schedules for Mixed-Model Assembly Lines in Just-in-Time Production Systems" , 1991 .
[2] Tamás Kis,et al. On the complexity of the car sequencing problem , 2004, Oper. Res. Lett..
[3] Avraham Shtub,et al. SEQUENCING MIXED-MODEL ASSEMBLY LINES TO LEVEL PARTS USAGE AND MINIMIZE LINE LENGTH , 1994 .
[4] Armin Scholl,et al. Balancing and Sequencing of Assembly Lines , 1995 .
[5] Bruce Parrello,et al. Car wars: (almost) birth of an expert system , 1988 .
[6] Pascal Van Hentenryck,et al. Solving the Car-Sequencing Problem in Constraint Logic Programming , 1988, ECAI.
[7] Yeongho Kim,et al. Sequencing in mixed model assembly lines: A genetic algorithm approach , 1996, Comput. Oper. Res..
[8] A. Drexl,et al. Materialflußorientierte Produktionssteuerung bei Variantenfließfertigung , 1994 .
[9] Yuanhui Zhang,et al. Mixed-model assembly line scheduling using the Lagrangian relaxation technique , 2000 .
[10] Edward R. Clayton,et al. Evaluating sequences for paced, mixed-model assembly lines with JIT component fabrication , 1996 .
[11] L. Tsai. Mixed-model sequencing to minimize utility work and the risk of conveyor stoppage , 1995 .
[12] Waldo C. Kabat,et al. Job-shop scheduling using automated reasoning: A case study of the car-sequencing problem , 2004, Journal of Automated Reasoning.
[13] Yasuhiro Monden,et al. Bicriteria sequencing for just-in-time mixed-model assembly lines , 2000 .
[14] Alf Kimms,et al. Sequencing JIT Mixed-Model Assembly Lines Under Station-Load and Part-Usage Constraints , 2001, Manag. Sci..
[15] W. Kubiak. Minimizing variation of production rates in just-in-time systems: A survey☆ , 1993 .
[16] A. Bolat,et al. Efficient methods for sequencing minimum job sets on mixed model assembly lines , 1997 .
[17] G. Steiner,et al. Level Schedules for Mixed-Model, Just-in-Time Processes , 1993 .
[18] Candace Arai Yano,et al. Sequencing to minimize work overload in assembly lines with product options , 1991 .
[19] R. R. Inman,et al. Sequencing JIT mixed-model assembly lines , 1991 .
[20] Yasuhiro Monden,et al. Toyota Production System: An Integrated Approach to Just-In-Time , 1993 .
[21] J. Miltenberg,et al. Level schedules for mixed-model assembly lines in just-in-time production systems , 1989 .