Sustainable performance of just-in-time (JIT) management in time-dependent batch delivery scheduling of precast construction

Abstract Despite a great deal of research into precast production scheduling published in academic journals worldwide, little attention has been given to environmental performance related to precast construction transportation and assembly scheduling problems. To address this issue, this paper studies the Just-in-Time (JIT) strategy for supply chain management of precast construction while considering time-dependent transportation time and on-site assembly time. There are two main contributions of our work. First, our analysis expands the current batch-scheduling model of minimizing earliness/tardiness penalties, by incorporating environmental impact considering the time-dependent transportation time and economic impact of resources wasted by waiting for on-site assembly. Second, we quantify the economic and environmental performance using our research objective, consisting of earliness/tardiness penalties, an additional transportation time penalty, and a resource waste penalty. The optimal results show that, compared with the supplier's intuitive minimax optimization with deliveries on the earliest due date, there is an average 10.7% reduction of the objective value of a one-day assembly task by our proposed method. The results also show that the objective of achieving additional environmental performance conflicts with that of obtaining economic performance. However, sensitivity analysis further shows it is not always true to consider only additional environmental performance for the suppliers to achieve ‘green’ value. For a sustainable business, the customer's service-JIT delivery should also be considered. Thus, when the policy makers assign importance weights to different objectives, they should fully consider both the economic and environmental impacts. The research contributes to batch delivery theory by expanding the approach to a time-dependent delivery model by considering both the economic and environmental effects. The method developed is of practical value for precast building projects to help in the successful implementation of sustainable development.

[1]  Sungsoo Park,et al.  A Robust Scenario Approach for the Vehicle Routing Problem with Uncertain Travel Times , 2014, Transp. Sci..

[2]  Gul Polat,et al.  Factors Affecting the Use of Precast Concrete Systems in the United States , 2008 .

[3]  Zhiliang Ma,et al.  Optimized flowshop scheduling of multiple production lines for precast production , 2016 .

[4]  Joseph Sarkis A STRATEGIC DECISION FRAMEWORK FOR GREEN SUPPLY CHAIN MANAGEMENT , 2003 .

[5]  Chris N. Potts,et al.  Supply chain scheduling: Batching and delivery , 2003, Oper. Res..

[6]  Ki-Hoon Lee,et al.  Integrating carbon footprint into supply chain management: the case of Hyundai Motor Company (HMC) in the automobile industry , 2011 .

[7]  John Christian,et al.  Effects of Delay Times on Production Rates in Construction , 1995 .

[8]  Chi Sun Poon,et al.  The evolution of prefabricated residential building systems in Hong Kong: A review of the public and the private sector , 2009 .

[9]  Carlos Henggeler Antunes,et al.  A multiple objective model to deal with economy-energy-environment interactions , 2004, Eur. J. Oper. Res..

[10]  Zhi-Long Chen,et al.  Scheduling and common due date assignment with earliness-tardiness penalties and batch delivery costs , 1996 .

[11]  Dvir Shabtay,et al.  Scheduling and due date assignment to minimize earliness, tardiness, holding, due date assignment and batch delivery costs , 2010 .

[12]  Jing Yang,et al.  Sustainable performance oriented operational decision-making of single machine systems with deterministic product arrival time , 2014 .

[13]  Weisheng Lu,et al.  Investigating waste reduction potential in the upstream processes of offshore prefabrication construction , 2013 .

[14]  V. Sharma,et al.  Green supply chain management related performance indicators in agro industry: A review , 2017 .

[15]  Akintola Akintoye,et al.  Just-in-Time application and implementation for building material management , 1995 .

[16]  Low Sui Pheng,et al.  EOQ, JIT and fixed costs in the ready-mixed concrete industry , 2006 .

[17]  Min-Yuan Cheng,et al.  Integrating barcode and GIS for monitoring construction progress , 2002 .

[18]  Guo-Sheng Liu,et al.  Minimizing energy consumption and tardiness penalty for fuzzy flow shop scheduling with state-dependent setup time , 2017 .

[19]  Chien-Ho Ko,et al.  An integrated framework for reducing precast fabrication inventory , 2010 .

[20]  Yuan Fang,et al.  Enhancing the logistics of construction materials through activity‐based simulation approach , 2009 .

[21]  Alfred A. Yee,et al.  SOCIAL AND ENVIRONMENTAL BENEFITS OF PRECAST CONCRETE TECHNOLOGY , 2001 .

[22]  Geoffrey Qiping Shen,et al.  Critical review of the research on the management of prefabricated construction , 2014 .

[23]  Washington Y. Ochieng,et al.  A Multi-Objective GA-based Optimisation for Holistic Manufacturing,transportation and Assembly of Precast Construction , 2016 .

[24]  Chris N. Potts,et al.  Scheduling with batching: A review , 2000, Eur. J. Oper. Res..

[25]  Mohammad Mahdavi Mazdeh,et al.  A branch-and-bound algorithm for single-machine scheduling with batch delivery minimizing flow times and delivery costs , 2007, Eur. J. Oper. Res..

[26]  A. Khalili,et al.  Integrated Prefabrication Configuration and Component Grouping for Resource Optimization of Precast Production , 2014 .

[27]  Hao Hu,et al.  An application of genetic algorithms to precast production scheduling , 2001 .

[28]  Mehrdad Arashpour,et al.  Off-site construction optimization: sequencing multiple job classes with time constraints , 2016 .

[29]  T. C. Edwin Cheng,et al.  Single-machine batch delivery scheduling with an assignable common due date and controllable processing times , 2013, Comput. Ind. Eng..

[30]  Chi Sun Poon,et al.  Sustainable construction aspects of using prefabrication in dense urban environment: a Hong Kong case study , 2008 .

[31]  Mehmet Bayram Yildirim,et al.  A framework to minimise total energy consumption and total tardiness on a single machine , 2008 .

[32]  Edward Anderson,et al.  Minimizing flow time on a single machine with job classes and setup times , 1991 .

[33]  T.C.E. Cheng,et al.  Single-machine batch delivery scheduling with an assignable common due window , 2013 .

[34]  Mark S. Daskin,et al.  Time Dependent Vehicle Routing Problems: Formulations, Properties and Heuristic Algorithms , 1992, Transp. Sci..

[35]  Huajun Cao,et al.  A carbon efficiency approach for life-cycle carbon emission characteristics of machine tools , 2012 .

[36]  David R. Riley,et al.  Decision support for construction method selection in concrete buildings: Prefabrication adoption and optimization , 2010 .

[37]  Low Sui Pheng,et al.  The application of JIT philosophy to construction: a case study in site layout , 1999 .

[38]  Lin Lin,et al.  A Simulation-Based Algorithm for the Capacitated Vehicle Routing Problem with Stochastic Travel Times , 2013, J. Appl. Math..

[39]  Tom Van Woensel,et al.  Branch and Price for the Time-Dependent Vehicle Routing Problem with Time Windows , 2013, Transp. Sci..

[40]  Chung Yee Lee,et al.  On scheduling to minimize earliness-tardiness and batch delivery costs with a common due date , 1993 .

[41]  Paul Mativenga,et al.  Sustainable machining: selection of optimum turning conditions based on minimum energy considerations , 2010 .

[42]  Sou-Sen Leu,et al.  Ga-based resource-constrained flow-shop scheduling model for mixed precast production , 2002 .

[43]  Low Sui Pheng,et al.  Just-in-Time Management of Precast Concrete Components , 2001 .

[44]  T.C.E. Cheng,et al.  Batch Delivery Scheduling on a Single Machine , 1994 .

[45]  Hao Hu,et al.  A Study of Resource Planning for Precast Production , 2007 .

[46]  Weng Tat Chan,et al.  Constraint Programming Approach to Precast Production Scheduling , 2002 .

[47]  Samuel Y. L. Yin,et al.  Developing a precast production management system using RFID technology , 2009 .

[48]  Low Sui Pheng,et al.  Modeling just-in-time purchasing in the ready mixed concrete industry , 2007 .

[49]  Ning Zhang,et al.  An optimization model for green supply chain management by using a big data analytic approach , 2017 .

[50]  Joaquín B. Ordieres Meré,et al.  Optimizing the production scheduling of a single machine to minimize total energy consumption costs , 2014 .

[51]  Low Sui Pheng,et al.  A study of the readiness of precasters for just‐in‐time construction , 2001 .

[52]  K. F. Man,et al.  Multi-product planning and scheduling using genetic algorithm approach , 2000 .

[53]  Sini Laari,et al.  Supply chain perspective on competitive strategies and green supply chain management strategies , 2017 .