Dynamic control of skilled and unskilled labour task assignments
暂无分享,去创建一个
[1] Sdp Simme Douwe Flapper,et al. Embedding JIT into MRP , 1991 .
[2] J. W. Walker,et al. Human resource planning , 1980 .
[3] Paul M. Goodrum. Worker Satisfaction and Job Preferences in the U.S. Construction Industry , 2003 .
[4] T.C.E. Cheng,et al. Just-in-Time Manufacturing: An introduction , 1992 .
[5] Graham Mills,et al. Multi-Skilled Workforce Optimisation , 2004, Ann. Oper. Res..
[6] Ki Seong Park. Economic Growth and Multiskilled Workers in Manufacturing , 1996, Journal of Labor Economics.
[7] I. A. Kouri,et al. The Principles and Planning Process of an Electronic Kanban System , 2008 .
[8] James H. Patterson,et al. Scheduling projects with heterogeneous resources to meet time and quality objectives , 2009, Eur. J. Oper. Res..
[9] Emery R. Hayhurst,et al. The Human Problems of an Industrial Civilization , 1934 .
[10] Joel Barnes,et al. Achieving Centimetre-level Positioning Accuracy in Urban Canyons with Locata Technology , 2007 .
[11] Suprasith Jarupathirun,et al. Supply Chain Efficiencies Through E-Kanban: A Case Study , 2009 .
[12] A. Kornhauser. The Human Problems of an Industrial Civilization. , 1934 .
[13] Serpil Sayin,et al. Production , Manufacturing and Logistics Assigning cross-trained workers to departments : A two-stage optimization model to maximize utility and skill improvement , 2006 .
[14] Choong Y. Lee. A Recent Development of the Integrated Manufacturing System: A Hybrid of MRP and JIT , 1993 .
[15] Amr Kandil,et al. Optimal Assignment of Multiskilled Labor in Building Construction Projects , 2010 .
[16] S. Iliffe,et al. Bmc Medical Research Methodology Open Access the Hawthorne Effect: a Randomised, Controlled Trial , 2022 .
[17] Mozafar Saadat,et al. A holonic shop floor workforce allocation system , 2010, 2010 5th International Conference on System of Systems Engineering.
[18] Luc Bongaerts,et al. Reference architecture for holonic manufacturing systems: PROSA , 1998 .