Effect of tree size on time of each work element and processing productivity using an excavator-based single-grip harvester or processor at a landing

We studied the effect of tree diameter at breast height (DBH) on the time required for the work elements in processing trees and on overall processing productivity at a landing. The times required for swinging with the tree, determining the butt-end cut, cutting the butt end, feeding and measuring, and cross-cutting were affected by the DBH of harvested trees. The time needed to process each tree was significantly longer for larger trees. However, the piece volume of trees increased as the diameter increased, and the rate of increase in volume was greater than the rate of increase in the time required to process one tree. Thus, processing productivity increased with increasing DBH (or piece volume) of harvested trees.

[1]  Grapple processor for plantation thinning , 1985 .

[2]  Jimin Tan A method to evaluate productivity of logging machines. , 1987 .

[3]  R. W. Brinker,et al.  Productivity of a Scandinavian cut-to-length system while second thinning pine plantations , 1993 .

[4]  Robert A. Tufts,et al.  Productivity and cost of the ponsse 15-series, cust-to-length harvesting systems in southern pine plantations , 1997 .

[5]  Produtividade e custos do processador trabalhando em povoamentos de Eucalyptus grandis Hill ex Maiden. , 1999 .

[6]  Bruce R. Hartsough,et al.  Cut-To-Length Harvesting of Short Rotation Eucalyptus at Simpson Tehama Fiber Farm , 1999 .

[7]  Lars Eliasson Effects of Establishment and Thinning of Shelterwoods on Harvester Performance , 2000 .

[8]  Tomas Nordfjell,et al.  Productivity and Costs in Shelterwood Harvesting , 2000 .

[9]  I. Vanha-Majamaa,et al.  Green Tree Retention in Fennoscandian Forestry , 2001 .

[10]  Dag Fjeld,et al.  Single-tree and Group Selection in Montane Norway Spruce Stands: Factors Influencing Operational Efficiency , 2001 .

[11]  Jingxin Wang,et al.  Production analysis of an excavator-based harvester: A case study in Finnish forest operations , 2002 .

[12]  Bruce R. Hartsough,et al.  Operational Trials of Cut-To-Length Harvesting of Poplar in a Mixed Wood Stand , 2005 .

[13]  Masahiko Nakagawa,et al.  Effect of Tree Size on Productivity and Time Required for Work Elements in Selective Thinning by a Harvester , 2007 .

[14]  Janusz M. Sowa,et al.  Costs and efficiency of timber harvesting by NIAB 5–15 processor mounted on a farm tractor , 2007 .

[15]  Operation analysis and improvement of a logging system using high-performance forestry machines in a mature forest , 2008 .