The association analysis for risk evaluation of significant delay occurrence in the completion date of construction project

It is widely known that a construction project can be described as a success if it is completed on time and without cost overrun. As the strong correlation between delay in completion date of construction projects and cost overruns exists, it is necessary to manage the risk of a delay from the very beginning: even before the start of works execution. The data concerning 139 construction contracts of the highway sections already completed, as well as their completion dates, were collected. The twelve types of data were chosen based on the criterion of time of appearance: they should be known before the start of construction works. Most of the contracts’ properties have continuous values, and these had to be converted to the binary values. With the use of the association analysis, it is possible to find the combination of properties of the construction contracts that have produced significant delays in completion date in large part of analysed and already completed contracts. For this purpose, appropriate software has been created. This paper will comprise the software approach to the problem as well as the result of the analysis, as it is based on real data completed. Getting the information on which combination of construction contract properties can cause a significant delay in completion date of the contract, the client can make decisions leading to avoiding risk, i.e. providing better circumstances for project success.

[1]  Michał Krzemiński,et al.  KASS v.2.2. Scheduling Software for Construction with Optimization Criteria Description , 2016 .

[2]  Ayman Abu Hammad,et al.  Delays in construction projects: The case of Jordan , 2008 .

[3]  Chang-Taek Hyun,et al.  A CBR-based hybrid model for predicting a construction duration and cost based on project characteristics in multi-family housing projects , 2010 .

[4]  A. Leśniak Classification of the Bid/No Bid Criteria – Factor Analysis , 2015 .

[6]  Serdar Ulubeyli,et al.  Causes of delays in construction projects in Turkey , 2012 .

[7]  T. Mezher,et al.  Causes of delays in the construction industry in Lebanon , 1998 .

[8]  Mirosława Lasek,et al.  Analiza asocjacji i reguły asocjacyjne w badaniu wyborów zajęć dydaktycznych dokonywanych przez studentów. Zastosowanie algorytmu Apriori , 2013 .

[9]  Kumar Neeraj Jha,et al.  Prediction of schedule performance of Indian construction projects using an artificial neural network , 2011 .

[10]  Mohan M. Kumaraswamy,et al.  A comparative study of causes of time overruns in Hong Kong construction projects , 1997 .

[11]  Kassim Gidado,et al.  Causes of project delay in the construction industry in Afghanistan , 2012 .

[12]  Michał Juszczyk A concise review of methods of construction works duration assesment , 2014 .

[13]  Alan Webb Using Earned Value: A Project Manager's Guide , 2003 .

[14]  Lynn Crawford,et al.  Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study , 2003 .

[15]  Murali Sambasivan,et al.  Causes and effects of delays in Malaysian construction industry , 2007 .

[16]  Nabi Ibadov Determination of the Risk Factors Impact on the Construction Projects Implementation Using Fuzzy Sets Theory , 2016 .

[17]  N. Ibadov,et al.  Construction project planning under fuzzy time constraint , 2019, International Journal of Environmental Science and Technology.

[18]  S. Ogunlana,et al.  Construction delays in a fast-growing economy: Comparing Thailand with other economies , 1996 .

[19]  Agnieszka Leśniak,et al.  Construction Delays in Clients Opinion – Multivariate Statistical Analysis , 2015 .

[20]  Lawrence Holder Discovering knowledge in DNA and protein data , 1998, SIGB.

[21]  Sameh M. El-Sayegh,et al.  Significant factors causing delay in the UAE construction industry , 2006 .

[22]  Nabi Ibadov Selection of Construction Project Taking into Account Technological and Organizational Risk , 2017 .

[23]  Artur Zbiciak,et al.  Przyczyny powstawania opóźnień w realizacji kontraktów budowlanych - analiza wstępnych wyników badania ankietowego , 2013 .

[24]  John M. Chambers,et al.  Software for data analysis , 2008 .

[25]  W. Duncan A GUIDE TO THE PROJECT MANAGEMENT BODY OF KNOWLEDGE , 1996 .

[26]  Anil Sawhney,et al.  Analysing factors affecting delays in Indian construction projects , 2012 .

[27]  John M. Chambers,et al.  Software for Data Analysis: Programming with R , 2008 .

[28]  Agata Czarnigowska,et al.  Zależność czas-koszt w przewidywaniu czasu realizacji budowy , 2013 .

[29]  Agata Czarnigowska,et al.  Time-Cost Relationship for Predicting Construction Duration , 2013 .

[30]  L. Zadeh Fuzzy sets as a basis for a theory of possibility , 1999 .

[31]  Mario Vanhoucke,et al.  A comparison of different project duration forecasting methods using earned value metrics , 2006 .

[32]  Tadeusz Morzy,et al.  Eksploracja danych : metody i algorytmy , 2013 .