Exact algorithms for inventory constrained scheduling on a single machine
暂无分享,去创建一个
[1] Nils Boysen,et al. Jena Research Papers in Business and Economics Truck Scheduling in Cross Docking Terminals with fixed Outbound Departures , 2010 .
[2] Nils Boysen,et al. Truck scheduling at zero-inventory cross docking terminals , 2010, Comput. Oper. Res..
[3] E.L. Lawler,et al. Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey , 1977 .
[4] Chuanli Zhao,et al. Single machine scheduling with general job-dependent aging effect and maintenance activities to minimize makespan , 2010 .
[5] Chung-Yee Lee,et al. Machine Scheduling with Availability Constraints , 2004, Handbook of Scheduling.
[6] Jacek Blazewicz,et al. Handbook on Scheduling , 2007 .
[7] Joseph Y.-T. Leung,et al. Handbook of Scheduling: Algorithms, Models, and Performance Analysis , 2004 .
[8] Dirk Briskorn,et al. Branch and Bound Algorithms for Minimizing Maximum Lateness of Trucks at a Transshipment Terminal , 2010 .
[9] Jürgen Zimmermann,et al. Scheduling tests in automotive R&D projects , 2009, Eur. J. Oper. Res..
[10] Gur Mosheiov,et al. Scheduling a maintenance activity and due-window assignment on a single machine , 2009, Comput. Oper. Res..
[11] M. Held,et al. A dynamic programming approach to sequencing problems , 1962, ACM National Meeting.
[12] Byung-Cheon Choi,et al. Complexity of single machine scheduling subject to nonnegative inventory constraints , 2010, Eur. J. Oper. Res..
[13] Nils Boysen,et al. Jena Research Papers in Business and Economics Scheduling Inbound and Outbound Trucks at Cross Docking Terminals , 2007 .
[14] Jen-Shiang Chen,et al. Scheduling of nonresumable jobs and flexible maintenance activities on a single machine to minimize makespan , 2008, Eur. J. Oper. Res..
[15] Michael Pinedo,et al. Scheduling: Theory, Algorithms, and Systems , 1994 .
[16] Feng Chen,et al. Minimizing makespan in two-stage hybrid cross docking scheduling problem , 2009, Comput. Oper. Res..
[17] Laurence A. Wolsey,et al. Integer and Combinatorial Optimization , 1988 .
[18] Christopher D. Geiger,et al. The parcel hub scheduling problem: A simulation-based solution approach , 2005, Comput. Ind. Eng..
[19] Klaus Neumann,et al. Scheduling of continuous and discontinuous material flows with intermediate storage restrictions , 2005, Eur. J. Oper. Res..
[20] Nils Boysen,et al. Cross dock scheduling: Classification, literature review and research agenda , 2010 .
[21] Klaus Neumann,et al. Project scheduling with inventory constraints , 2003, Math. Methods Oper. Res..
[22] Chung-Yee Lee,et al. Minimizing the makespan in a two-machine cross-docking flow shop problem , 2009, Eur. J. Oper. Res..
[23] Andrew Lim,et al. Truck dock assignment problem with operational time constraint within crossdocks , 2006, Eur. J. Oper. Res..
[24] Chung-Yee Lee,et al. Machine scheduling with an availability constraint , 1996, J. Glob. Optim..
[25] Hongxing Li,et al. Scheduling problems with multiple maintenance activities and non-preemptive jobs on two identical parallel machines , 2010 .
[26] Norbert Trautmann,et al. Batch scheduling in process industries: an application of resource–constrained project scheduling , 2000, OR Spectr..
[27] Pius J. Egbelu,et al. Scheduling of inbound and outbound trucks in cross docking systems with temporary storage , 2008, Eur. J. Oper. Res..