Simple tool of analysis for cycle time reduction
暂无分享,去创建一个
T. Sada | R. A. Yuen | M. Ichikawa | M. Yamada | K. Kabata
[1] G. Iuliano,et al. Improving cycle time through managing variability in a DRAM production line , 1997, 1997 IEEE International Symposium on Semiconductor Manufacturing Conference Proceedings (Cat. No.97CH36023).
[2] T. Yamaguchi,et al. Optimum tool planning using the X-factor theory , 1999, 1999 IEEE International Symposium on Semiconductor Manufacturing Conference Proceedings (Cat No.99CH36314).