Reactive power automatic arrangement method based on available resource of reactive equipment
暂无分享,去创建一个
The method of the present invention is research and attempts to schedule automatic reactive power in the actual data, is proposed based on an automatic arrangement Reactive Reactive device resources available methods. This method embodiment is arranged for the data network structure and parameters of power output and load size, the number of arrangements for the automatic input shunt capacitance reactor, guaranteed voltage certified to meet reactive power Ping Heng. Based reactive current flow arrangement basis, taking into account the actual installation situation shunt capacitance reactors, the full use of existing equipment resources to achieve reactive power Ping Heng region. The method of trend data for reactive power Ping Heng, can improve the rationality of reactive power grid arranged in a way to improve the convergence of the trend data to help develop a reasonable reactive configuration, automated way arrangements.