Development of Construction Cost Model through the Analysis of Critical Work Items
暂无分享,去创建一个
In construction project planning and control, a cost model performs a critical role such as cost determination on a contract stage and cost tracing. The model can maximize owner's profit and value within the project budget and optimize cost management works on overall construction implementation stages. A BoQ(Bill of Quantities) generally adopted in a unit price contract has been applied as an important tool for cost control and forecast. However a previous cost model based on the BoQ has shown limitations in that it requires too detailed information and heavy manpower on cost management and difficulty in keeping relationship with construction planning, scheduling and progress management. The each cost items and unit prices which constitute of construction works are individually very important management factors but the relative weight for each items and prices have a difference on the contents and conditions of each conditions of each construction works. In consideration of this structural mechanism of cost determination, this research is aimed at examining the critical factors affecting the construction cost determination and propose and verify a new cost forecasting model which is more simple and efficient and also keeps the accuracy of cost management.