Environmental benefits of parking-integrated photovoltaics: A 222kWp experience

The life cycle assessment of a grid-connected, parking integrated, 222 kWp cadmium telluride photovoltaic system has been performed. The system was built at the University of Murcia and has been monitored for 2.5 years (sampling data every 5 min). The detailed material inventory, the energy embedded in the system, the energy payback time, and the energy return factor of the facility have been obtained and are 6.31 TJ equivalent primary energy, 2.06  and 12.16years, respectively. The average performance ratio is 0.8 with a slight monthly variation. Additionally, the environmental benefits of the architectural integration (in this case parking integration) have been quantified using a standard methodology for the calculation of several environmental parameters. Finally, the environmental benefits of renewable energy generation because of the savings of producing the same amount of electricity by the Spanish grid system have been assessed. Copyright © 2013 John Wiley & Sons, Ltd.

[1]  Martin Kumar Patel,et al.  Ex‐ante environmental and economic evaluation of polymer photovoltaics , 2009 .

[2]  Mark Gillott,et al.  The potential of semitransparent photovoltaic devices for architectural integration: The development of device performance and improvement of the indoor environmental quality and comfort through case-study application , 2011 .

[3]  Emmanuel Kymakis,et al.  Performance analysis of a grid connected photovoltaic park on the island of Crete , 2009 .

[4]  R. Martínez-Béjar,et al.  Life cycle assessment study of a 4.2 kWp stand-alone photovoltaic system , 2009 .

[5]  Erik Alsema,et al.  Energy requirements of thin-film solar cell modules—a review , 1998 .

[6]  Tariq Muneer,et al.  Life cycle assessment of a medium-sized photovoltaic facility at a high latitude location , 2006 .

[7]  Vasilis Fthenakis,et al.  Methodology Guidelines on Life Cycle Assessment of Photovoltaic Electricity 3rd Edition , 2016 .

[8]  Wim Turkenburg,et al.  Greenhouse gas emissions associated with photovoltaic electricity from crystalline silicon modules under various energy supply options , 2011 .

[9]  Ranko Goic,et al.  review of solar photovoltaic technologies , 2011 .

[10]  Didier Beloin-Saint-Pierre,et al.  Environmental impacts of large-scale grid-connected ground-mounted PV installations , 2011 .

[11]  Geoffrey P. Hammond,et al.  Integrated appraisal of a building integrated photovoltaic (BIPV) system , 2009, 2009 International Conference on Sustainable Power Generation and Supply.

[12]  H. Radhi Energy analysis of façade-integrated photovoltaic systems applied to UAE commercial buildings , 2010 .

[13]  Vasilis Fthenakis,et al.  Façade–integrated photovoltaics: a life cycle and performance assessment case study , 2012 .

[14]  Lin Lu,et al.  Environmental payback time analysis of a roof-mounted building-integrated photovoltaic (BIPV) system in Hong Kong , 2010 .

[15]  Evert Nieuwlaar,et al.  Energy viability of photovoltaic systems , 2000 .

[16]  Robert Ilg,et al.  Update of environmental indicators and energy payback time of CdTe PV systems in Europe , 2011 .