An innovative approach for gob-side entry retaining in highly gassy fully-mechanized longwall top-coal caving

Abstract An innovative gateroad layout in highly gassy longwall top coal caving in a Chinese coal mine based on gob-side entry retaining (GER) was introduced. The numerical model was used to design the rational roadside backfill body (RBB) with high-water quick-setting materials. In order to improve the reliability of the numerical modeling, the double-yield model for gob modeling and the strain-softening model for RBB modeling are validated in detail. The results of the validated model indicate that when the RBB width is 1.5 m, the RBB peak vertical stress is minimal and surrounding rock convergence variation of GER becomes gentle. Consequently, the rational RBB width can be estimated as 1.5 m. Field test and field monitoring indicate that the GER in N2105 panel with a width of 1.5 m roadside backfill body and high-strength cable-rockbolt support could meet the requirement for gas drainage and ventilation during panel N2105 was retreating. It also proved that the new gateroad layout met the requirement for the highly gassy thick seam operation, and provided a new way to the coal mine safety production in similar conditions.

[1]  Hai Su,et al.  Study on gob-side entry retaining in fully-mechanized longwall with top-coal caving and its application , 2015 .

[2]  Wu Yong-zheng In-situ stress measurements and distribution laws in Lu'an underground coal mines , 2010 .

[3]  A. H. Wilson 831145 Stress and stability in coal ribsides and pillars : Proc 1st Conference on Ground Control in Mining, Morgantown, 27–29 July 1981, Pl-12. Publ Morgantown: West Virginia University, 1981 , 1983 .

[4]  Xie Wen-bing,et al.  The key problem study about gob-side entry retaining in top-coal caving mining face , 2004 .

[5]  Chen Yong,et al.  Support technology research and application inside roadway of gob-side entry retaining , 2012 .

[6]  Syd S. Peng,et al.  Numerical Modeling for Yield Pillar Design: A Case Study , 2014, Rock Mechanics and Rock Engineering.

[7]  Charles Jaeger,et al.  Rock mechanics and engineering: Author Index , 1979 .

[8]  B.G.D. Smart,et al.  Further development of the roof strata tilt concept for pack design and the estimation of stress development in a caved waste , 1987 .

[9]  Xiangyu Wang,et al.  An innovative approach for gateroad layout in highly gassy longwall top coal caving , 2013 .

[10]  Yan Lixin,et al.  CHARACTERISTICS OF SURROUNDING ROCK DEFORMATION AND REINFORCEMENT TECHNOLOGY OF RETAINED ENTRY IN WORKING FACE WITH MULTI-ENTRY LAYOUT , 2012 .

[11]  Y. M. Cheng,et al.  Three-dimensional analysis of coal barrier pillars in tailgate area adjacent to the fully mechanized top caving mining face , 2010 .

[12]  D. J. Reddish,et al.  The relation between in situ and laboratory rock properties used in numerical modelling , 1997 .