A practical approach to project scheduling: considering the potential quality loss cost in the time–cost tradeoff problem
暂无分享,去创建一个
[1] W. L. Meyer,et al. Extensions of the critical path method through the application of integer programming , 1963 .
[2] M. Dessouky,et al. Solving the Project Time/Cost Tradeoff Problem Using the Minimal Cut Concept , 1977 .
[3] S. K. Goyal. Note---A Note on “A Simple CPM Time-Cost Tradeoff Algorithm” , 1975 .
[4] Do Ba Khang,et al. Time, cost and quality trade-off in project management: a case study , 1999 .
[5] Prem Vrat,et al. A goal programming model for project crashing with piecewise linear time-cost trade-off , 1986 .
[6] John Wateridge,et al. How can IS/IT projects be measured for success? , 1998 .
[7] James H. Patterson,et al. A Horizon-Varying, Zero-One Approach to Project Scheduling , 1974 .
[8] Srinivas Talluri,et al. Faster, better, cheaper: A study of NPD project efficiency and performance tradeoffs , 2006 .
[9] Erik Demeulemeester,et al. Optimal procedures for the discrete time/cost trade-off problem in project networks , 1996 .
[10] Mario Vanhoucke,et al. The discrete time/cost trade-off problem: extensions and heuristic procedures , 2007, J. Sched..
[11] G. Lieberman,et al. Introduction to Mathematical Programming , 1990 .
[12] Jerome D Wiest,et al. THE SCHEDULING OF LARGE PROJECTS WITH LIMITED RESOURCES , 1962 .
[13] Hamed R. Tareghian,et al. A solution procedure for the discrete time, cost and quality tradeoff problem using electromagnetic scatter search , 2007, Appl. Math. Comput..
[14] Hamed R. Tareghian,et al. On the discrete time, cost and quality trade-off problem , 2006, Appl. Math. Comput..
[15] Roger Atkinson,et al. Project management: cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria , 1999 .
[16] Wang Cheng-en,et al. A multi-mode resource-constrained discrete time–cost tradeoff problem and its genetic algorithm based solution , 2009 .
[17] J. D. Wiest,et al. Management Guide to PERT/CPM , 1969 .
[18] Christoph Schwindt,et al. Resource allocation in project management , 2005 .
[19] Walter O. Rom,et al. Ensuring quality in resource constrained project scheduling , 1997 .
[20] Peter Brucker,et al. Complex Scheduling , 2006 .
[21] D. R. Robinson. A Dynamic Programming Solution to Cost-Time Tradeoff for CPM , 1975 .
[22] Chung-Wei Feng,et al. Using genetic algorithms to solve construction time-cost trade-off problems , 1997 .
[23] Nicolai Siemens. A Simple CPM Time-Cost Tradeoff Algorithm , 1971 .
[24] Sadi Assaf,et al. Causes of delay in large construction projects , 2006 .
[25] Srilal Perera. Linear Programming Solution to Network Compression , 1980 .
[26] W. Verdini,et al. Nonlinear time/cost tradeoff models in project management , 1995 .
[27] Nalina Suresh,et al. Project management with time, cost, and quality considerations , 1996 .
[28] Jean Couillard,et al. Assessing and controlling the quality of a project end product: the earned quality method , 2000, IEEE Trans. Engineering Management.
[29] D. R. Fulkerson. A Network Flow Computation for Project Cost Curves , 1961 .
[30] James E. Kelley,et al. Critical-Path Planning and Scheduling: Mathematical Basis , 1961 .
[31] Christina M. Scott-Young,et al. Project success and project team management: Evidence from capital projects in the process industries , 2008 .
[32] R. E. Cooke-Yarborough,et al. Critical Path Planning and Scheduling: An Introduction and Example , 1964 .
[33] A. Chakrabarti,et al. Speeding Up the Pace of New Product Development , 1999 .
[34] Nigel J. Smith,et al. Application of a fuzzy based decision making methodology to construction project risk assessment , 2007 .
[35] Karen Tate,et al. Getting Started in Project Management , 2001 .
[36] David I. Cleland,et al. Matrix Management Systems Handbook , 1984 .
[37] Athanasios P. Chassiakos,et al. Project time-cost analysis under generalised precedence relations , 2002 .