Insights on Accident Information and System Operations during Fukushima Events
暂无分享,去创建一个
[1] Poong-Hyun Seong,et al. An analytic model for situation assessment of nuclear power plant operators based on Bayesian inference , 2006, Reliab. Eng. Syst. Saf..
[2] T. Narabayashi,et al. Lessons learned from the Fukushima Daiichi Nuclear Power Plant Accident , 2012 .
[3] A. D. Swain,et al. Handbook of human-reliability analysis with emphasis on nuclear power plant applications. Final report , 1983 .
[4] Leon Cizelj,et al. Long-Term Station Blackout Accident Analyses of a PWR with RELAP5/MOD3.3 , 2013 .
[5] I. Kataoka. Review of thermal-hydraulic researches in severe accidents in light water reactors , 2013 .
[6] I. Linkov,et al. Integrating Risk and Resilience Approaches to Catastrophe Management in Engineering Systems , 2013, Risk analysis : an official publication of the Society for Risk Analysis.
[7] Yushi Fujita,et al. THE FUKUSHIMA DISASTER-SYSTEMIC FAILURES AS THE LACK OF RESILIENCE , 2013 .
[8] Shun-ichi TANAKA,et al. Accident at the Fukushima Dai-ichi Nuclear Power Stations of TEPCO —Outline & lessons learned— , 2012, Proceedings of the Japan Academy. Series B, Physical and biological sciences.
[9] George Vayssier,et al. PRESENT DAY EOPS AND SAMG - WHERE DO WE GO FROM HERE? , 2012 .
[10] Jeffrey N Cardoni,et al. MELCOR Simulations of the Severe Accident at the Fukushima 1F2 Reactor. , 2012 .
[11] Morten Mørup,et al. A Bayesian Analysis of the Radioactive Releases of Fukushima , 2012, AISTATS.
[12] A. D. Swain. Accident Sequence Evaluation Program: Human reliability analysis procedure , 1987 .
[13] Karl N. Fleming,et al. A risk informed defense-in-depth framework for existing and advanced reactors , 2002, Reliab. Eng. Syst. Saf..
[14] Takatoshi Hattori,et al. Radiation protection lessons learned from the TEPCO Fukushima No.1 NPS accident , 2014 .
[15] Y. Sibamoto,et al. Insights from review and analysis of the Fukushima Dai-ichi accident , 2012 .
[16] Hisashi Nakamura,et al. A Numerical Simulation of Global Transport of Atmospheric Particles Emitted from the Fukushima Daiichi Nuclear Power Plant , 2011 .
[17] Poong-Hyun Seong,et al. A computational model for evaluating the effects of attention, memory, and mental models on situation assessment of nuclear power plant operators , 2009, Reliab. Eng. Syst. Saf..
[18] Susan Y. Pickering,et al. Fukushima Daiichi accident study : status as of April 2012. , 2012 .
[19] T. Matsuzawa,et al. Coupling coefficient, hierarchical structure, and earthquake cycle for the source area of the 2011 off the Pacific coast of Tohoku earthquake inferred from small repeating earthquake data , 2011 .
[20] Tomoyoshi Takeda,et al. Development of a Probabilistic Tsunami Hazard Analysis in Japan , 2006 .
[21] Pascal Achim,et al. Analysis of Radionuclide Releases from the Fukushima Dai-ichi Nuclear Power Plant Accident Part II , 2014, Pure and Applied Geophysics.
[22] Joon-Eon Yang,et al. FUKUSHIMA DAI-ICHI ACCIDENT: LESSONS LEARNED AND FUTURE ACTIONS FROM THE RISK PERSPECTIVES , 2014 .
[23] Katsumi Ebisawa,et al. CURRENT ISSUES ON PRA REGARDING SEISMIC AND TSUNAMI EVENTS AT MULTI UNITS AND SITES BASED ON LESSONS LEARNED FROM TOHOKU EARTHQUAKE/TSUNAMI , 2012 .
[24] Francesco Saverio D'Auria,et al. The Fukushima Event: The Outline and the Technological Background , 2012 .
[25] Achim,et al. Analysis of Radionuclide Releases from the Fukushima Dai-Ichi Nuclear Power Plant Accident Part I , 2012, Pure and Applied Geophysics.
[26] Francesc Reventos,et al. Preliminary Assessment of the Possible BWR Core/Vessel Damage States for Fukushima Daiichi Station Blackout Scenarios Using RELAP/SCDAPSIM , 2012 .
[27] Jan Christian Kaiser,et al. Empirical Risk Analysis of Severe Reactor Accidents in Nuclear Power Plants after Fukushima , 2012 .
[28] Elisabeth Paté-Cornell,et al. On “Black Swans” and “Perfect Storms”: Risk Analysis and Management When Statistics Are Not Enough , 2012, Risk analysis : an official publication of the Society for Risk Analysis.
[29] Sakuda Hiroshi,et al. Critical review on what factors affected the evolution of the Fukushima accident , 2013 .
[30] Soon Heung Chang,et al. A combined deterministic and probabilistic procedure for safety assessment of beyond design basis accidents in nuclear power plant: Application to ECCS performance assessment for design basis LOCA redefinition , 2013 .
[31] Maqua Michael,et al. The Fukushima Daiichi Nuclear Power Plant Accident: OECD/NEA Nuclear Safety Response and Lessons Learnt , 2013 .
[32] Soon Heung Chang,et al. Analysis of economics and safety to cope with station blackout in PWR , 2013 .
[33] D. D. Yue,et al. Severe-accident-sequence assessment of hypothetical complete-station blackout at the Browns Ferry Nuclear Plant , 1981 .
[34] Takeuchi Michiru,et al. Safety-critical human factors issues derived from analysis of the TEPCO Fukushima Daiichi accident investigation reports , 2013 .
[35] Fumiya Tanabe,et al. Analyses of core melt and re-melt in the Fukushima Daiichi nuclear reactors , 2012 .
[36] Tatsujiro Suzuki. Deconstructing the zero-risk mindset: The lessons and future responsibilities for a post-Fukushima nuclear Japan , 2011 .
[37] S. Rahman. Reliability Engineering and System Safety , 2011 .