ADDRESSING "BEHIND THE SCENES" ECOLOGICAL CONCERNS ASSOCIATED WITH THE DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE OF AN URBAN TRANSPORTATION SYSTEM- A NEW YORK CITY TRANSIT PERSPECTIVE ON SUSTAINABILITY

In 1999, The New York City Transit’s (NYCT) Department of Capital Program Management achieved ISO14001 certification- Environmental Management Systems. Today, sustainable design is an integral part of all design, construction, procurement and operations and maintenance activities. This paper outlines NYC Transit’s adoption of sustainable business practices which exposed significant opportunities to reduce the impact to ecologies. These practices encompass high-performance building designs, renewable energy applications, conservation of energy, water and natural resources, waste reduction, recycling and reuse, environmentally responsible procurement and total life cycle analysis. A cause-and-effect benefit is then demonstrated for many of these sustainable practices encompassing both local and geographically distant ecologies. Some examples include the inadvertent procurement of Azobe (an unsustainably over-harvested tropical hardwood from Africa) used as rail ties in the design and construction of rail tracks; the demand for large quantities of energy to move rolling stocks, contributing to toxic emissions fallout from regional power plants; the contribution to poor ambient air quality as a result of non-regulated off-road diesel equipment emission from construction sites. In recognition of the need to reduce our ecological footprint, NYCT took upon itself a proactive role to establish a rigorous environmental management program and to identify, control and reduce those activities that lead up to “behind the scene” ecological impacts.

[1]  Stabilizing Forest Roads to Help Restore Fish Habitats: A Northwest Washington Example , 1993 .

[2]  M. Madej Erosion and sediment delivery following removal of forest roads , 2001 .

[3]  R. Holthausen,et al.  Source habitats for terrestrial vertebrates of focus in the interior Columbia basin: broad-scale trends and management implications. Volume 3 - appendices. , 2000 .

[4]  E. Redente,et al.  Restoration methods for abandoned roads at lower elevations in Grand Teton national park, Wyoming , 1991 .

[5]  H J Verkaar,et al.  Nature engineering and civil engineering works. , 1990 .

[6]  C. Norwood Linkages in the Landscape: The Role of Corridors and Connectivity in wildlife Conservation , 1999 .

[7]  J. Hickenbottom A Comparative Analysis of Surface Erosion and Water Runoff from Existing and Recontoured Forest Roads: O'Brien Creek Watershed, Lolo National Forest, Montana , 2000 .

[8]  C. Luce Effectiveness of Road Ripping in Restoring Infiltration Capacity of Forest Roads , 1997 .

[9]  David L. Steensen,et al.  WATERSHED REHABILITATION IN REDWOOD NATIONAL PARK , 1992 .

[10]  David G. Havlick No Place Distant: Roads and Motorized Recreation on America's Public Lands , 2002 .

[11]  R. Holthausen,et al.  Source habitats for terrestrial vertebrates of focus in the interior Columbia basin: broadscale trends and management implications. Volume 1—Overview. , 2000 .

[12]  K. Bradley Evaluation of two techniques for the utilization of logging residues| Organic mulch for abandoned road revegetation and accelerated decomposition in small chipped piles , 1997 .

[13]  C. Frissell,et al.  Review of Ecological Effects of Roads on Terrestrial and Aquatic Communities , 2000 .

[14]  R. Schuster,et al.  Relative Effects on a Low-Volume Road System of Landslides Resulting from Episodic Storms in Northern Idaho , 1999 .

[15]  D. McNabb,et al.  Tillage of compacted haul roads and landings in the boreal forests of Alberta, Canada , 1994 .