The effect of batch sizing and customer pressure (order modification) on a hybrid assembly job shop
暂无分享,去创建一个
[1] Sumer C. Aggarwal,et al. An investigation of multiproduct, multimachine production scheduling and inventory control of a flow-shop system , 1978 .
[2] Graham K. Rand,et al. Decision Systems for Inventory Management and Production Planning , 1979 .
[3] C. T. Baker,et al. Simulation of a Simplified Job Shop , 1960 .
[4] Bernard W. Taylor,et al. An evaluation of scheduling policies in a dual resource constrained assembly shop , 1985 .
[5] Philip Y. Huang,et al. A comparative study of priority dispatching rules in a hybrid assembly/job shop , 1984 .
[6] U. Karmarkar,et al. Computationally Efficient Optimal Solutions to the Lot-Sizing Problem in Multistage Assembly Systems , 1984 .
[7] Lee W. Shruben. Control of initialization bias in multivariate simulation response , 1981 .
[8] Leroy B. Schwarz,et al. Optimal and System Myopic Policies for Multi-Echelon Production/Inventory Assembly Systems , 1975 .
[9] George Schussel. Job-Shop Lot Release Sizes , 1968 .
[10] U. Karmarkar,et al. Lotsizing in Multi-Item Multi- Machine Job Shops , 1985 .
[11] Thom J. Hodgson,et al. An N-Product, Multi-Machine, Lotsize Scheduling Model , 1973 .
[12] H. Taha,et al. The Economic Lot Sizes in Multistage Production Systems , 1970 .
[13] Anthony J. Zahorik,et al. Network Programming Models for Production Scheduling in Multi-Stage, Multi-Item Capacitated Systems , 1984 .