The UK railway network contains around 20,000 miles of track and is now carrying more, faster and heavier trains than previously. The effective management of this ageing and increasingly utilised system with limited financial resources is a significant challenge. Modelling tools are required to investigate the alternative strategies to manage such assets. The models available to date are very limited in their capability. A fundamental problem is their inability to adequately account for the underlying degradation process which is strongly dependent upon the history of the previous maintenance carried out. They also lack the complexity to enable the detailed maintenance and renewal options to be explored. This paper describes a modelling approach which first of all analyses the available data on the track geometry, and by implication the condition of the ballast, gathered at regular intervals by a measurement train. The analysis produces distributions of times for the track geometry to degrade to a specified state. Degradation distributions are therefore of relevance to the railway network under consideration, avoiding the need to use generic and possibly inappropriate data. With the degradation distributions available, a track section model is formed which incorporates the maintenance and renewal processes and provides a means of predicting the condition of the ballast section over time. The model uses a Petri net formulation with a Monte Carlo solution routine and enables the effectiveness of different maintenance strategies to be investigated. Ways in which the complexity of the model can be increased if desired is discussed and a case study is provided to indicate the use of the model.

[1]  A Hamid,et al.  TRACK-QUALITY INDICES AND TRACK-DEGRADATION MODELS FOR MAINTENANCE-OF-WAY PLANNING , 1981 .

[2]  Alan J Bing,et al.  DEVELOPMENT OF RAILROAD TRACK DEGRADATION MODELS , 1983 .

[3]  John Andrews,et al.  Reliability and Risk Assessment , 1994 .

[4]  Eckehard Schnieder,et al.  A Heuristic Approach to Railway Track Maintenance Scheduling , 2010 .

[5]  E Schnieder,et al.  Monte Carlo simulation of railway track geometry deterioration and restoration , 2012 .

[6]  Javad Sadeghi,et al.  Development of improved railway track degradation models , 2010 .

[7]  Per Hokstad,et al.  RAMS Management of Railway Tracks , 2008 .

[8]  Sarah J. Dunnett,et al.  Phased mission modelling of systems with maintenance-free operating periods using simulated Petri nets , 2008, Reliab. Eng. Syst. Saf..

[9]  Luca Podofillini,et al.  Risk-informed optimisation of railway tracks inspection and maintenance procedures , 2006, Reliab. Eng. Syst. Saf..

[10]  Hakan Guler,et al.  Modelling railway track geometry deterioration , 2011 .

[11]  M. Shenton Ballast deformation and track deterioration , 1985 .

[12]  Sato Yoshihiko,et al.  Japanese Studies on Deterioration of Ballasted Track , 1995 .

[13]  J. Hammersley SIMULATION AND THE MONTE CARLO METHOD , 1982 .

[14]  Dirk P. Kroese,et al.  Simulation and the Monte Carlo method , 1981, Wiley series in probability and mathematical statistics.

[15]  Kurt Jensen Coloured Petri Nets , 1992, EATCS Monographs in Theoretical Computer Science.

[16]  Winfrid Schneeweiss,et al.  Zur Vergröberung/Verfeinerung von Petri-Netzen bei der Zuverlässigkeits-Modellbildung (On Coarsening/Refining Petri Nets for Reliability Modeling) , 2003 .

[17]  Uday Kumar,et al.  Holistic procedure for rail maintenance in Sweden , 2008 .