Deployment and demonstration of wide area monitoring system in power system of Great Britain

The creation of a suitable wide area monitoring system (WAMS) is widely recognized as an essential aspect of delivering a power system that will be secure, efficient and sustainable for the foreseeable future. In Great Britain (GB), the deployment of the first WAMS to monitor the entire power system in real time was the responsibility of the visualization of real time system dynamics using enhanced monitoring (VISOR) project. The core scope of the VISOR project is to deploy this WAMS and demonstrate how WAMS applications can in the near term provide system operators and planners with clear, actionable information. This paper presents the wider scope of the VISOR project and the GB wide WAMS that has been deployed. Furthermore, the paper describes some of the WAMS applications that have been deployed and provides examples of the measurement device performance issues that have been encountered during the project.

[1]  Zhenyu Huang,et al.  Model validation with hybrid dynamic simulation , 2006, 2006 IEEE Power Engineering Society General Meeting.

[2]  Robert E. Wilson,et al.  Calculation of Transmission Line Parameters From Synchronized Measurements , 1999 .

[3]  Di Shi,et al.  Identification of short transmission-line parameters from synchrophasor measurements , 2008, 2008 40th North American Power Symposium.

[4]  Arun G. Phadke,et al.  Synchronized Phasor Measurements and Their Applications , 2008 .

[5]  Yuan Liao,et al.  Online Optimal Transmission Line Parameter Estimation for Relaying Applications , 2009, IEEE Transactions on Power Delivery.

[6]  R.-M. He,et al.  Wide area measurements-based model validation and its application , 2008 .

[7]  Eric Allen,et al.  Validation of power system models , 2010, IEEE PES General Meeting.

[8]  S.M. Amin For the Good of the Grid , 2008, IEEE Power and Energy Magazine.

[9]  Tianshu Bi,et al.  Measurements get together , 2009, IEEE Power and Energy Magazine.

[10]  Vahid Madani,et al.  Wide-Area Monitoring, Protection, and Control of Future Electric Power Networks , 2011, Proceedings of the IEEE.

[11]  G. Brunello,et al.  An overview of the IEEE Standard C37.118.2 — Synchrophasor Data Transfer for Power Systems , 2014 .

[12]  K. R. Padiyar,et al.  Analysis of Subsynchronous Resonance in Power Systems , 1998 .

[13]  P. Wall,et al.  Inertia estimation using PMUs in a laboratory , 2014, IEEE PES Innovative Smart Grid Technologies, Europe.

[14]  Joe H. Chow,et al.  Phasor-Measurement-Based State Estimation for Synchrophasor Data Quality Improvement and Power Transfer Interface Monitoring , 2014, IEEE Transactions on Power Systems.

[15]  J. S. Thorp,et al.  State Estimlatjon with Phasor Measurements , 1986, IEEE Transactions on Power Systems.

[16]  Peter Wall,et al.  Roadmap for the deployment of WAMPAC in the future GB power system , 2016 .

[17]  P. Wall,et al.  Estimation of load model parameters from PMU measurements , 2014, IEEE PES Innovative Smart Grid Technologies, Europe.

[18]  Zhenyu Huang,et al.  Benchmarking of planning models using recorded dynamics , 2009, 2009 IEEE/PES Power Systems Conference and Exposition.

[19]  S. Chakrabarti,et al.  A Constrained Formulation for Hybrid State Estimation , 2011, IEEE Transactions on Power Systems.

[20]  Wei Hu,et al.  An energy-based method for location of power system oscillation source , 2013, IEEE Transactions on Power Systems.

[21]  Vladimir V. Terzija,et al.  Wide Area Inter-Area Oscillation Monitoring Using Fast Nonlinear Estimation Algorithm , 2013, IEEE Transactions on Smart Grid.

[22]  Janusz Bialek,et al.  Classification of mode damping and amplitude in power systems using synchrophasor measurements and classification trees , 2013, IEEE Transactions on Power Systems.

[23]  Ping Ju,et al.  The disturbance source identification of forced power oscillation caused by continuous cyclical load , 2011, 2011 4th International Conference on Electric Utility Deregulation and Restructuring and Power Technologies (DRPT).