Impact of safety factors and setup time reduction in a two-echelon supply chain management
暂无分享,去创建一个
Namhun Kim | Rekha Guchhait | Biswajit Sarkar | Sarla Pareek | Mitali Sarkar | B. Sarkar | M. Sarkar | Namhun Kim | Sarla Pareek | Rekha Guchhait
[1] B. Sarkar,et al. Single-vendor multi-buyer game theoretic model under multi-factor dependent demand , 2017 .
[2] Felix T.S. Chan,et al. Optimization of product refurbishment in closed-loop supply chain using multi-period model integrated with fuzzy controller under uncertainties , 2018 .
[3] Leopoldo Eduardo Cárdenas-Barrón,et al. A multi-machine multi-product EPQ problem for an imperfect manufacturing system considering utilization and allocation decisions , 2016, Expert Syst. Appl..
[4] David F. Pyke,et al. Inventory management and production planning and scheduling , 1998 .
[5] Dongmin Shin,et al. Controllable lead time, service level constraint, and transportation discounts in a continuous review inventory model , 2016, RAIRO Oper. Res..
[6] Luis Herrera,et al. Simulation-based multi-objective model for supply chains with disruptions in transportation , 2017 .
[7] Abdul Raouf,et al. Inventory Models Involving Lead Time as a Decision Variable , 1994 .
[8] C. Liao,et al. An Analytical Determination of Lead Time with Normal Demand , 1991 .
[9] Leopoldo Eduardo Cárdenas-Barrón,et al. Celebrating a century of the economic order quantity model in honor of Ford Whitman Harris , 2014 .
[10] Christoph H. Glock,et al. Lead time reduction strategies in a single-vendor–single-buyer integrated inventory model with lot size-dependent lead times and stochastic demand , 2012 .
[11] Ilkyeong Moon,et al. A note on lead time and distributional assumptions in continuous review inventory models , 1998, Comput. Oper. Res..
[12] R. J. Tersine. Principles of inventory and materials management , 1982 .
[13] Mohamed Ben-Daya,et al. Some stochastic inventory models with deterministic variable lead time , 1999, Eur. J. Oper. Res..
[14] B. Sarkar,et al. An economic production quantity model with random defective rate, rework process and backorders for a single stage production system , 2014 .
[15] G. Gallego,et al. Distribution Free Procedures for Some Inventory Models , 1994 .
[16] Jason Chao-Hsien Pan,et al. The Learning Effect on setup Cost Reduction for Mixture inventory Models with Variable lead Time , 2008, Asia Pac. J. Oper. Res..
[17] L. Cárdenas-Barrón,et al. A production-inventory model for a two-echelon supply chain when demand is dependent on sales teams׳ initiatives , 2014 .
[18] B. Sarkar,et al. Effect of variable transportation and carbon emission in a three-echelon supply chain model , 2016 .
[19] Hui-Ming Wee,et al. An improved algorithm and solution on an integrated production-inventory model in a three-layer supply chain , 2012 .
[20] Biswajit Sarkar,et al. Manufacturing quality improvement and setup cost reduction in a vendor-buyer supply chain model , 2017 .
[21] Chong Peng,et al. Empirical study of manufacturing enterprise collaboration network: Formation and characteristics , 2016 .
[22] Ata Allah Taleizadeh,et al. Lead time aggregation: A three-echelon supply chain model , 2016 .
[23] Chandra K. Jaggi,et al. Credit financing in economic ordering policies for defective items with allowable shortages , 2013, Appl. Math. Comput..
[24] Liang-Yuh Ouyang,et al. Quality improvement, setup cost and lead-time reductions in lot size reorder point models with an imperfect production process , 2002, Comput. Oper. Res..
[25] B. Sarkar,et al. Quality improvement and backorder price discount under controllable lead time in an inventory model , 2015 .
[26] Herbert E. Scarf,et al. A Min-Max Solution of an Inventory Problem , 1957 .
[27] K. S. Chaudhuri,et al. Optimal reliability, production lot size and safety stock in an imperfect production system , 2010, Int. J. Math. Oper. Res..
[28] B. Sarkar,et al. Improved quality, setup cost reduction, and variable backorder costs in an imperfect production process , 2014 .
[29] G. Gallego,et al. The Distribution Free Newsboy Problem: Review and Extensions , 1993 .
[30] B. Sarkar,et al. Application of distribution- free approach in integrated and dual-channel supply chain under buyback contract , 2017 .
[31] L. Cárdenas-Barrón,et al. Learning and screening errors in an EPQ inventory model for supply chains with stochastic lead time demands , 2017, Int. J. Prod. Res..
[32] Bhaba R. Sarker,et al. Optimal manufacturing batch size with rework process at a single-stage production system , 2004, Comput. Ind. Eng..
[33] Biswajit Sarkar,et al. Optimal batch quantity in a cleaner multi-stage lean production system with random defective rate , 2016 .
[34] L. Cárdenas-Barrón,et al. Coordinating a socially responsible closed-loop supply chain with product recycling , 2017 .
[35] Christian Mose,et al. Process chain evaluation for an overall optimization of energy efficiency in manufacturing-The welding case , 2015 .
[36] Mohamed Ben-Daya,et al. Lead-time reduction in a stochastic inventory system with learning consideration , 2003 .
[37] Evan L. Porteus. Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction , 1986, Oper. Res..
[38] L. Ouyang,et al. Mixture Inventory Model with Backorders and Lost Sales for Variable Lead Time , 1996 .
[39] Biswajit Sarkar,et al. Integrated vendor-buyer supply chain model with vendor's setup cost reduction , 2013, Appl. Math. Comput..
[40] K. S. Chaudhuri,et al. Production lot sizing with process deterioration and machine breakdown , 2008, Eur. J. Oper. Res..