Formulas of Revised MRP

Information sharing among supply chain echelons is now an acquired result. As a consequence, most of the traditional techniques and procedures in production management must be revised and updated, exploiting the opportunities provided by new technologies. This paper presents an improved version of Material Requirement Planning procedure, which assumes information sharing capabilities and permits the creation of new business opportunities. In Orlicky's MRP, orders are computed considering the parent items gross requirements. On the contrary, here the order release procedure related to a certain item is computed both by exploiting all the information sharing advantages and by introducing a drastic innovation to the main process functioning. As a result, the proposed algorithm copes better with demand uncertainty, lowers the system nervousness and also removes the need for continuous forecast adjustments, thereby improving the ease in managing the material flow, allowing the development of new forms of collaboration among different supply chain partners and the creation of new business networks. The algorithm is presented in formulas to describe in detail each procedure step and calculations.

[1]  Karl Inderfurth Nervousness in inventory control: Analytical results , 1994 .

[2]  Frank Y. Chen,et al.  Quantifying the Bullwhip Effect in a Simple Supply Chain: The Impact of Forecasting, Lead Times, and Information.: The Impact of Forecasting, Lead Times, and Information. , 2000 .

[3]  Hau L. Lee,et al.  The bullwhip effect in supply chains , 2015, IEEE Engineering Management Review.

[4]  Dean H. Kropp,et al.  A comparison of strategies to dampen nervousness in MRP systems , 1986 .

[5]  Jeff Hoi Yan Yeung,et al.  Parameters affecting the effectiveness of MRP systems: A review , 1998 .

[6]  Massimiliano M. Schiraldi,et al.  A Revised and Improved Version of the MRP Algorithm: Rev MRP , 2013 .

[7]  Nagesh N. Murthy,et al.  Achieving supply chain agility through IT integration and flexibility , 2008 .

[8]  Silvanus T. Enns MRP performance effects due to forecast bias and demand uncertainty , 2002, Eur. J. Oper. Res..

[9]  V. Sridharan,et al.  The impact of safety stock on schedule instability, cost and service , 1989 .

[10]  Michele Grimaldi,et al.  A dynamic view of knowledge and information: a stock and flow based methodology , 2008 .

[11]  M. Naim,et al.  Supply chain flexibility as a determinant of supplier selection , 2010 .

[12]  Herwig Winkler,et al.  How to improve supply chain flexibility using strategic supply chain networks , 2009, Logist. Res..

[13]  Herbert Jodlbauer,et al.  Material and capacity requirements planning with dynamic lead times , 2012 .

[14]  Petri Hautaniemi,et al.  The choice of replenishment policies in an MRP environment , 1999 .

[15]  Anders Segerstedt Formulas of MRP , 1996 .

[16]  Alf Kimms,et al.  Stability measures for rolling schedules with applications to capacity expansion planning, master production scheduling, and lot sizing , 1998 .

[17]  W. C. Benton,et al.  Supply chain practice and information sharing , 2007 .

[18]  van Kh Karel Donselaar,et al.  How to release orders in order to minimise system inventory and system nervousness , 2002 .

[19]  Ralf W. Seifert,et al.  Interrelating operational and financial performance measurements in inventory control , 2010, Eur. J. Oper. Res..

[20]  Massimiliano M. Schiraldi,et al.  Lot Sizing Heuristics Performance , 2013 .

[21]  Bernard Grabot,et al.  MRP-based negotiation in customer-supplier relationship , 2012 .

[22]  Michele Grimaldi,et al.  Knowledge-based inter-organizational collaborations , 2010, J. Knowl. Manag..

[23]  Michele Grimaldi,et al.  KM versus enterprise 2.0: a framework to tame the clash , 2013, Int. J. Inf. Technol. Manag..

[24]  V. Sridharan,et al.  Alternative approaches for reducing schedule instability in multistage manufacturing under demand uncertainty , 1995 .

[25]  Everett E. Adam,et al.  Forecasting error evaluation in material requirements planning (MRP) production-inventory systems , 1986 .

[26]  Yi-Feng Hung,et al.  Real-time capacity requirement planning for make-to-order manufacturing with variable time-window orders , 2013, Comput. Ind. Eng..

[27]  Robin O. Roundy,et al.  Rounding Off to Powers of Two in Continuous Relaxations of Capacitated Lot Sizing Problems , 1989 .

[28]  Yi Zhang,et al.  A Optimized MRP Batch Decision Model and its Application , 2011 .

[29]  Rakesh Nagi,et al.  New lot-sizing formulations for less nervous production schedules , 2000, Comput. Oper. Res..

[30]  Willem H.M. Zijm,et al.  Capacity planning and lead time management , 1996 .

[31]  V. D. R. Guide,et al.  A review of techniques for buffering against uncertainty with MRP systems , 2000 .

[32]  D. Clay Whybark,et al.  MATERIAL REQUIREMENTS PLANNING UNDER UNCERTAINTY , 1976 .

[33]  John A. Buzacott,et al.  Safety stock versus safety time in MRP controlled production systems , 1994 .