Heuristics and simulated annealing procedures for the accessibility windows assembly line problem level 1 (AWALBP-L1)

Abstract In some assembly lines, the workpieces are larger than the workstations. This implies that at a given instant the workstations have access to only a portion of the workpieces. In this context, the accessibility windows assembly line balancing problem (AWALBP) arises. In the AWALBP, the cycle is split into forward steps and stationary stages. The workpieces advance during the forward steps and the tasks are processed during the stationary stages. In each stationary stage, the workstations have access to different parts of the workpieces. This work solves the first level of AWALBP (AWALBP-L1), which consists in assigning the tasks among the workstations and stationary stages. Specifically, it is considered the AWALBP-L1 case in which the tasks can be processed in several workstations and their processing times depend on the workstation in which the tasks are processed. To solve the problem, we propose several heuristics and simulated annealing procedures. An extensive computational experiment is carried out to evaluate their performance.

[1]  Wolfgang Stille Solution techniques for specific bin packing problems with applications to assembly line optimization , 2008 .

[2]  Sungsoo Park,et al.  A heuristic for an assembly line balancing problem with incompatibility, range, and partial precedence constraints , 1997 .

[3]  Alexandre Dolgui,et al.  A taxonomy of line balancing problems and their solutionapproaches , 2013 .

[4]  Albert Corominas,et al.  Combining matheuristics and MILP to solve the accessibility windows assembly line balancing problem level 2 (AWALBP-L2) , 2014, Comput. Oper. Res..

[5]  Karsten Weihe,et al.  Moving Policies in Cyclic Assembly-Line Scheduling , 2004, IWPEC.

[6]  Hans Otto Günther,et al.  A GA-based solution approach for balancing printed circuit board assembly lines , 2008, OR Spectr..

[7]  C. D. Gelatt,et al.  Optimization by Simulated Annealing , 1983, Science.

[8]  Michael J. Magazine,et al.  Assembly line balancing as generalized bin packing , 1982, Oper. Res. Lett..

[9]  Ilker Baybars,et al.  A survey of exact algorithms for the simple assembly line balancing , 1986 .

[10]  Hui Sun,et al.  Comparing two weighted approaches for sequencing mixed-model assembly lines with multiple objectives , 2006 .

[11]  Manuel Laguna,et al.  Fine-Tuning of Algorithms Using Fractional Experimental Designs and Local Search , 2006, Oper. Res..

[12]  Albert Corominas,et al.  A MILP model for the Accessibility Windows Assembly Line Balancing Problem (AWALBP) , 2013 .

[13]  Kathryn A. Dowsland,et al.  Simulated Annealing , 1989, Encyclopedia of GIS.

[14]  Amaia Lusa,et al.  A survey of the literature on the multiple or parallel assembly line balancing problem , 2008 .

[15]  Siamak Tazari,et al.  Algorithmic Approaches for Two Fundamental Optimization Problems: Workload-Balancing and Planar Steiner Trees , 2006 .

[16]  Nils Boysen,et al.  Assembly line balancing: Which model to use when? , 2006 .

[17]  Karsten Weihe,et al.  Workload Balancing in Multi-stage Production Processes , 2006, WEA.

[18]  Robert R. Inman,et al.  SCHEDULING DUPLICATE SERIAL STATIONS IN TRANSFER LINES , 1994 .

[19]  Alexandre Dolgui,et al.  An evaluation of constructive heuristic methods for solving the alternative subgraphs assembly line balancing problem , 2009, J. Heuristics.

[20]  Armin Scholl,et al.  A survey on problems and methods in generalized assembly line balancing , 2006, Eur. J. Oper. Res..

[21]  Habibollah Haron,et al.  Accumulated risk of body postures in assembly line balancing problem and modeling through a multi-criteria fuzzy-genetic algorithm , 2012, Comput. Ind. Eng..

[22]  Rafael Pastor,et al.  Heuristic procedures for solving the general assembly line balancing problem with setups , 2010 .

[23]  Rita Gamberini,et al.  A new multi-objective heuristic algorithm for solving the stochastic assembly line re-balancing problem , 2006 .

[24]  Carlos Andrés,et al.  Tabu search algorithms for an industrial multi-product and multi-objective assembly line balancing problem, with reduction of the task dispersion , 2002, J. Oper. Res. Soc..

[25]  John Miltenburg,et al.  Balancing and Scheduling Mixed-Model U-Shaped Production Lines , 2002 .

[26]  Albert Corominas,et al.  Assembly line balancing: general resource-constrained case , 2011 .

[27]  Armin Scholl,et al.  State-of-the-art exact and heuristic solution procedures for simple assembly line balancing , 2006, Eur. J. Oper. Res..

[28]  Nils Boysen,et al.  A classification of assembly line balancing problems , 2007, Eur. J. Oper. Res..