Drum-type boiler following control configuration

Many control configuration schemes are used to accomplish a power station boiler following control task. Yet the choice of the best scheme for this task is still an open problem. A way to solve this problem with the aid of optimization is presented. The optimization results were carried out on a drum type boiler and improved significantly the MW response of the boiler. >