Optimizing train stopping patterns and schedules for high-speed passenger rail corridors

High-speed railway (HSR) systems have been developing rapidly in China and various other countries throughout the past decade; as a result, the question of how to efficiently operate such large-scale systems is posing a new challenge to the railway industry. A high-quality train timetable should take full advantage of the system’s capacity to meet transportation demands. This paper presents a mathematical model for optimizing a train timetable for an HSR system. The authors propose an innovative methodology using a column-generation-based heuristic algorithm to simultaneously account for both passenger service demands and train scheduling. First, the authors transform a mathematical model into a simple linear programming problem using a Lagrangian relaxation method. Second, the authors search for the optimal solution by updating the restricted master problem (RMP) and the sub-problems in an iterative process using the column-generation-based algorithm. Finally, the authors consider the Beijing–Shanghai HSR line as a real-world application of the methodology; the results show that the optimization model and algorithm can improve the defined profit function by approximately 30% and increase the line capacity by approximately 27%. This methodology has the potential to improve the service level and capacity of HSR lines with no additional high-cost capital investment (e.g., the addition of new tracks, bridges and tunnels on the mainline and/or at stations).

[1]  Paolo Toth,et al.  A Lagrangian heuristic algorithm for a real-world train timetabling problem , 2006, Discret. Appl. Math..

[2]  Ricardo Giesen,et al.  Continuous Approximation for Skip-Stop Operation in Rail Transit , 2013 .

[3]  Belarmino Adenso-Díaz,et al.  On-line timetable re-scheduling in regional train services , 1999 .

[4]  Alberto Caprara Almost 20 Years of Combinatorial Optimization for Railway Planning: from Lagrangian Relaxation to Column Generation , 2010, ATMOS.

[5]  Matteo Fischetti,et al.  Modeling and Solving the Train Timetabling Problem , 2002, Oper. Res..

[6]  Xuesong Zhou,et al.  Simultaneous train rerouting and rescheduling on an N-track network: A model reformulation with network-based cumulative flow variables , 2014 .

[7]  Yusin Lee,et al.  A heuristic for the train pathing and timetabling problem , 2009 .

[8]  Lixing Yang,et al.  Collaborative optimization for train scheduling and train stop planning on high-speed railways , 2016 .

[9]  Seyed Jafar Sadjadi,et al.  Robust Train Timetabling Problem: Mathematical Model and Branch and Bound Algorithm , 2012, IEEE Transactions on Intelligent Transportation Systems.

[10]  Arjang A. Assad,et al.  MODELS FOR RAIL TRANSPORTATION , 1980 .

[11]  Dung-Ying Lin,et al.  Using Genetic Algorithms to Optimize Stopping Patterns for Passenger Rail Transportation , 2014, Comput. Aided Civ. Infrastructure Eng..

[12]  Fu Hui-ling Research on Passenger Flow Assignment Method Based on Complex Train Service Network , 2012 .

[13]  I. A. Hansen,et al.  Railway Network Timetabling and Dynamic Traffic Management , 2009 .

[14]  Xuesong Zhou,et al.  Single-Track Train Timetabling with Guaranteed Optimality: Branch-and-Bound Algorithms with Enhanced Lower Bounds , 2007 .

[15]  Ricardo García-Ródenas,et al.  High-speed railway scheduling based on user preferences , 2015, Eur. J. Oper. Res..

[16]  Dario Pacciarelli,et al.  Assessment of flexible timetables in real-time traffic management of a railway bottleneck , 2008 .

[17]  Anita Schöbel,et al.  Line planning in public transportation: models and methods , 2012, OR Spectr..

[18]  Daiheng Ni,et al.  Trajectory Reconstruction for Travel Time Estimation , 2008, J. Intell. Transp. Syst..

[19]  Francesco Corman,et al.  Evaluating Disturbance Robustness of Railway Schedules , 2014, J. Intell. Transp. Syst..

[20]  Huiling Fu,et al.  A hierarchical line planning approach for a large-scale high speed rail network: The China case , 2015 .

[21]  Marc Peeters,et al.  Circulation of railway rolling stock: a branch-and-price approach , 2003, Comput. Oper. Res..

[22]  Sung-Pil Hong,et al.  An appraisal of a column-generation-based algorithm for centralized train-conflict resolution on a metropolitan railway network , 2011 .

[23]  Xuesong Zhou,et al.  Optimizing urban rail timetable under time-dependent demand and oversaturated conditions , 2013 .

[24]  Yihua Li,et al.  High-Speed Train Network Routing with Column Generation , 2014 .

[25]  Zhou Wen-liang Stop Schedule Plan Optimization for Passenger Train , 2009 .

[26]  Chengxuan Cao,et al.  Multi-objective optimization of train routing problem combined with train scheduling on a high-speed railway network , 2014 .

[27]  Erhan Kozan,et al.  Scheduling Trains with Priorities: A No-Wait Blocking Parallel-Machine Job-Shop Scheduling Model , 2011, Transp. Sci..

[28]  Paolo Toth,et al.  A column generation approach to train timetabling on a corridor , 2008, 4OR.

[29]  Harvey J. Miller,et al.  Transportation network design for maximizing space–time accessibility , 2015 .

[30]  Chung-Hsing Yeh,et al.  A Multiobjective Model for Passenger Train Services Planning: Application to Taiwan's High-Speed Rail Line , 2000 .

[31]  Cameron G. Walker,et al.  Simultaneous disruption recovery of a train timetable and crew roster in real time , 2005, Comput. Oper. Res..

[32]  Paolo Toth,et al.  Nominal and robust train timetabling problems , 2012, Eur. J. Oper. Res..

[33]  Per Olov Lindberg,et al.  Railway Timetabling Using Lagrangian Relaxation , 1998, Transp. Sci..

[34]  Xuesong Zhou,et al.  Train scheduling for minimizing passenger waiting time with time-dependent demand and skip-stop patterns: Nonlinear integer programming models with linear constraints , 2015 .

[35]  Ismail Sahin,et al.  Railway traffic control and train scheduling based oninter-train conflict management , 1999 .

[36]  Allan Larsen,et al.  The Simultaneous Vehicle Scheduling and Passenger Service Problem , 2013, Transp. Sci..

[37]  Paolo Toth,et al.  Non-cyclic train timetabling and comparability graphs , 2010, Oper. Res. Lett..

[38]  Taketoshi Kunimatsu,et al.  Train timetable evaluation from the viewpoint of passengers by microsimulation of train operation and passenger flow , 2012 .