Strategic real option and flexibility analysis for nuclear power plants considering uncertainty in electricity demand and public acceptance
暂无分享,去创建一个
[1] R Bellman,et al. On the Theory of Dynamic Programming. , 1952, Proceedings of the National Academy of Sciences of the United States of America.
[2] S. Ross,et al. Option pricing: A simplified approach☆ , 1979 .
[3] Sheldon M. Ross,et al. Stochastic Processes , 2018, Gauge Integral Structures for Stochastic Calculus and Quantum Electrodynamics.
[4] B. Kamrad,et al. Multinomial Approximating Models for Options with k State Variables , 1991 .
[5] Eduardo S. Schwartz,et al. Investment Under Uncertainty. , 1994 .
[6] L. Trigeorgis. Real Options: Managerial Flexibility and Strategy in Resource Allocation , 1996 .
[7] Wei Chen,et al. A Probabilistic-Based Design Model for Achieving Flexibility in Design , 1999 .
[8] Leonard J. Tashman,et al. Out-of-sample tests of forecasting accuracy: an analysis and review , 2000 .
[9] M. Chesney,et al. Long-term risk management of nuclear waste: a real options approach , 2002 .
[10] M. Golay. On Social Acceptance of Nuclear Power , 2001 .
[11] Olivier L. de Weck,et al. Staged Deployment of Communications Satellite Constellations in Low Earth Orbit , 2004, J. Aerosp. Comput. Inf. Commun..
[12] Eun Suk Suh,et al. Flexible product platforms: framework and case study , 2007, DAC 2006.
[13] G. Rothwell. A real options approach to-evaluating new nuclear power plants , 2006 .
[14] Public Acceptance of Nuclear Power-Some Ethical Issues , 2007 .
[15] Daniel E. Hastings,et al. Measuring the Value of Flexibility in Space Systems: A Six-Element Framework: Regular Papers , 2007 .
[16] Daniel E. Hastings,et al. Measuring the Value of Flexibility in Space Systems: A Six‐Element Framework , 2007, Syst. Eng..
[17] Osman Alp,et al. Tactical capacity management under capacity flexibility , 2008 .
[18] Daniel E. Hastings,et al. Defining changeability: Reconciling flexibility, adaptability, scalability, modifiability, and robustness for maintaining system lifecycle value , 2008, Syst. Eng..
[19] Daniel E. Hastings,et al. Defining changeability: Reconciling flexibility, adaptability, scalability, modifiability, and robustness for maintaining system lifecycle value , 2008 .
[20] Afzal S. Siddiqui,et al. How to Proceed with Competing Alternative Energy Technologies: A Real Options Analysis , 2009 .
[21] M. Abdelhamid,et al. A real options approach to investing in the first nuclear power plant under cost uncertainty: comparison with natural gas power plant for the Tunisian case , 2009 .
[22] Joseph H. Saleh,et al. Flexibility: a multi-disciplinary literature review and a research agenda for designing flexible engineering systems , 2009 .
[23] W. Nuttall,et al. Is nuclear power inflexible , 2009 .
[24] I. Kessides. Nuclear Power: Understanding the Economic Risks and Uncertainties , 2010 .
[25] Richard de Neufville,et al. Flexibility in Engineering Design , 2011 .
[26] D. L. Woodruff,et al. Modeling and solving a large-scale generation expansion planning problem under uncertainty , 2011 .
[27] J. Jiao. Product platform flexibility planning by hybrid real options analysis , 2012 .
[28] Michel-Alexandre Cardin,et al. Minimising the economic cost and risk to accelerator-driven subcritical reactor technology: The case of designing for flexibility: Part 1 , 2012 .
[29] Paul L. Joskow,et al. The Future of Nuclear Power After Fukushima , 2012 .
[30] Michel-Alexandre Cardin,et al. Minimizing the economic cost and risk to Accelerator-Driven Subcritical Reactor technology. Part 2: The case of designing for flexibility , 2012 .
[31] Lei Zhu. A simulation based real options approach for the investment evaluation of nuclear power , 2012, Comput. Ind. Eng..
[32] Yosep Song,et al. Risk communication in South Korea: Social acceptance of nuclear power plants (NPPs) , 2013 .
[33] S. Kidd. Nuclear power – Economics and public acceptance , 2013 .
[34] A. Mol,et al. Public participation and trust in nuclear power development in China , 2013 .
[35] Yang Liu,et al. Effect of the Fukushima nuclear accident on the risk perception of residents near a nuclear power plant in China , 2013, Proceedings of the National Academy of Sciences.
[36] Cornelis W. Oosterlee,et al. Construction strategies and lifetime uncertainties for nuclear projects: A real option analysis , 2013 .
[37] Cornelis W. Oosterlee,et al. Valuing modular nuclear power plants in finite time decision horizon , 2013 .
[38] P. John Clarkson,et al. A technique to assess the changeability of complex engineering systems , 2013 .
[39] C. Oosterlee,et al. Decision-support tool for assessing future nuclear reactor generation portfolios , 2014 .
[40] W. Nuttall,et al. The siting of UK nuclear reactors , 2014, Journal of radiological protection : official journal of the Society for Radiological Protection.
[41] Michel-Alexandre Cardin,et al. Enabling Flexibility in Engineering Systems: A Taxonomy of Procedures and a Design Framework , 2014 .
[42] G. Locatelli,et al. Load following with Small Modular Reactors : a real option analysis , 2014 .
[43] D. McGowan,et al. Iodine-131 monitoring in sewage plant outflow , 2014, Journal of radiological protection : official journal of the Society for Radiological Protection.
[44] Eswaran Subrahmanian,et al. Managing and supporting product life cycle through engineering change management for a complex product , 2015 .
[45] M. Arnaud. Nuclear power in China , 2015 .
[46] B. Taebi,et al. The socio-technical challenges of nuclear power production and waste management in the post-Fukushima era: editors’ overview , 2015 .
[47] Jianxi Luo,et al. A simulation-based method to evaluate the impact of product architecture on product evolvability , 2015 .
[48] Giorgio Locatelli,et al. Load following with Small Modular Reactors (SMR): A real options analysis , 2015 .
[49] Michel-Alexandre Cardin,et al. Generating flexibility in the design of engineering systems to enable better sustainability and lifecycle performance , 2015 .
[50] Michel-Alexandre Cardin,et al. Analyzing the Tradeoffs Between Economies of Scale, Time-Value of Money, and Flexibility in Design Under Uncertainty: Study of Centralized Versus Decentralized Waste-to-Energy Systems , 2016 .
[51] Michel-Alexandre Cardin,et al. An approach for analyzing and managing flexibility in engineering systems design based on decision rules and multistage stochastic programming , 2017 .