New technology for partial discharge testing of operating generators and motors
暂无分享,去创建一个
Partial discharges (corona) are a symptom of most types of deterioration of high voltage motor and generator stator windings. A new type of partial discharge test is described. It can be performed by plant personnel during normal operation of the machine. The key requirement of the new test is to remove all the interference caused by other sparking and discharging sources in a plant. The test uses either high voltage capacitive sensors or 1000 MHz electromagnetic couplers to detect the discharge signals. The signals are processed by a specialized electronic instrument to remove noise. this test is specially designed for high speed machines.
[1] Michael J. Kurtz,et al. Experience with PDA diagnostic testing on hydraulic generators , 1988 .
[2] M. Kurtz,et al. Generator Insulation Diagnostic Testing , 1979, IEEE Transactions on Power Apparatus and Systems.
[3] A. Audoli,et al. Generator and motor stator monitoring based on partial discharge quadratic rate measurement , 1992, Conference Record of the 1992 IEEE International Symposium on Electrical Insulation.
[4] H. G. Sedding,et al. A new sensor for detecting partial discharges in operating turbine generators , 1991 .